For PI form 1 Table PIf 1-9
ND-v2009 PIf1:Development Program and Site Typeposted by Fai Leung on
How to count the number of buildings if multiple buildings share the same podium? For example: One Residential building and one office building are both constructed above the same mulit-floors sho
FTE calculations and bicycle parking
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Nicholas Klever on
I am working on certifying an addition to a military readiness center which operates drill weekends so the facility occupants greatly increases for 2 those 2 days each month.
shuttle bus to rail station
CI-2009 SSc3.1:Credit Alternative Transportation—Public Transportation Accessposted by Gail Napell on
we have a project with the main entrance 0.3 miles from 4 public shuttle bus stops that provide express connections to a commuter (and regional, and national!) railway station.
ESC plan for Existing Building Minimal Sitework
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Annalise Reichert on
I am working on a project that encompasses the major renovation of an existing classroom/warehouse building.
EV charging stations VS energy model
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Anya Fiechtl on
Have others on this forum documented electric vehicle charging stations in the energy model for EAp2 and EAc1? Any advice?
2 point minimum requirement
NC-2009 EAc1:Optimize Energy Performanceposted by Mike Stopka on
I just wanted to verify that "Two (2) points mandatory for all LEED for New Construction projects registered after June 26, 2007" rule is no longer in effect. Referring to this: http://www.usgbc.o
Process Load
NC-2009 EAc1:Optimize Energy Performanceposted by Muzammal Abbas on
Dear all, We are doing a factory project in pakistan, which have a 1200 kw process machinery load, after energy modeling without process load we are saving 55 % from baseline but after adding proce
IEQp1: Minimum Indoor Air Quality Performance
CI-2009 IEQp1:Minimum IAQ Performanceposted by Arslan Faisal on
We are working on a plaza which have office spaces. we submit this project. But in the review report they asking the following documents.
metal roof sealant
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by cathy keagle on
Which category does Novaflex metal roof sealant fall into? Thanks
Temporary Materials - Formwork
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Christopher Drew on
The materials credits apply to components that are permanently installed in the building.