Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

For PI form 1 Table PIf 1-9

ND-v2009 PIf1:Development Program and Site Type
posted by  Fai Leung  on 

How to count the number of buildings if multiple buildings share the same podium? For example: One Residential building and one office building are both constructed above the same mulit-floors sho

0

FTE calculations and bicycle parking

NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  Nicholas Klever  on 

I am working on certifying an addition to a military readiness center which operates drill weekends so the facility occupants greatly increases for 2 those 2 days each month.

1
Fri Nov 27, 2015, 2:21 pm

shuttle bus to rail station

CI-2009 SSc3.1:Credit Alternative Transportation—Public Transportation Access
posted by  Gail Napell  on 

we have a project with the main entrance 0.3 miles from 4 public shuttle bus stops that provide express connections to a commuter (and regional, and national!) railway station.

0

ESC plan for Existing Building Minimal Sitework

NC-2009 SSp1:Construction Activity Pollution Prevention
posted by  Annalise Reichert  on 

I am working on a project that encompasses the major renovation of an existing classroom/warehouse building.

1
Mon Aug 17, 2015, 10:14 pm

EV charging stations VS energy model

NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  Anya Fiechtl  on 

Have others on this forum documented electric vehicle charging stations in the energy model for EAp2 and EAc1? Any advice?

1
Mon Aug 24, 2015, 3:48 pm

2 point minimum requirement

NC-2009 EAc1:Optimize Energy Performance
posted by  Mike Stopka  on 

I just wanted to verify that "Two (2) points mandatory for all LEED for New Construction projects registered after June 26, 2007" rule is no longer in effect. Referring to this: http://www.usgbc.o

1
Tue Aug 18, 2015, 1:06 pm

Process Load

NC-2009 EAc1:Optimize Energy Performance
posted by  Muzammal Abbas  on 

Dear all, We are doing a factory project in pakistan, which have a 1200 kw process machinery load, after energy modeling without process load we are saving 55 % from baseline but after adding proce

1
Tue Aug 18, 2015, 1:10 pm

IEQp1: Minimum Indoor Air Quality Performance

CI-2009 IEQp1:Minimum IAQ Performance
posted by  Arslan Faisal  on 

We are working on a plaza which have office spaces. we submit this project. But in the review report they asking the following documents.

0

metal roof sealant

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  cathy keagle  on 

Which category does Novaflex metal roof sealant fall into? Thanks

1
Wed Aug 19, 2015, 1:24 am

Temporary Materials - Formwork

NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materials
posted by  Christopher Drew  on 

The materials credits apply to components that are permanently installed in the building.

1
Wed Aug 19, 2015, 12:18 pm