EA Pr2 Form V5 - EAp2-9
Schools-2009 EAp2:Minimum Energy Performanceposted by Robert Barrett on
My project does not comply with section 1.9A (minimum compliance requirements for process energy modeling) so I need to upload a narrative.
Ceramic Tile Reporting on LEED IEQ4.3 Form
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Rachael Vidulich on
We have ceramic tile flooring on our project and I understand this is exempt from the testing requirements but do you need to list it on the IEQ4.3 form?
Camp Lemonnier - Naval Base in Djibouti, Africa
NC-2009 SSc1:Site Selectionposted by Peg Manuel on
We have a dormitory project at a US Naval Installation in Djibouti, Africa.
Option 4, Case 1, Path 2: No new parking
posted by Ricardo Sá on
What do you understand for "No parking will be provided or subsidized for tenant employees."?
Multiple tram lines stops within boundary
ND-v4 SLLc3:Access to quality transitposted by Philippa Cameron on
Hi, Our site has a number of tram stops located within the boundary and 1/4 mile from new and existing buildings, but only two service lines (one circular route in both directions and one east-wes
B-Corp Certification
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Michelle DiPenti on
Does anyone know if USGBC will accept the B-Corp Certification for Option 1? Thank you!
How to claifiy a permanet no-smoking signate
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Leanne Niu on
We recently got a mid-review for IEQp2. The exterior smoking policy of the project is entirely composed of a taped-on sheet of paper.
Future Expansion
NC-2009 PIf2:Project Summary Detailsposted by Mary Kay on
We have a building under construction now for which we will pursue LEED certification.
2009 BD+C and 2009 CS on Campus site- SSc4.2
posted by Deborah Lucking on
SSc4.2 is listed as a "Campus" credit. However, we have one project that is pursuing Major Renovation, and another pursuing Core & Shell certification.
LEED ND registration questions
ND-v2009 PIf2:Project Timelineposted by Gurpreet Misra on
1. Do we have to register projects under LEED ND V4 (it being released) or projects can still be registered under LEED ND 2009? 2.