Acceptable methods of Glare Control

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Paul Rogers  on 

I know that glare control is a requirement for each window.

1
Mon Mar 2, 2015, 1:29 pm

Bicycle & Changing rooms in basement , 200 yards

CS-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  Deepika Parmar  on 

Our project consists of three buildings connected through the basement and is registered under campus development. We are providing bicycle racks and shower changing rooms in the basement.

1
Thu Mar 5, 2015, 5:30 pm

High-Volume vs. Convenience Copier 5,000 pages - CIR 872 Canada

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Lindsey Kindrat  on 

Heads up for those working on LEED Canada NC 2009 projects, CIR 872 ruled 5,000 pages per month as the definition limit for a convenience copier. Ruling provided 2012-06-08.

0

District virtual rate:

NC-2009 EAp2:Minimum Energy Performance
posted by  Haojie Wang  on 

We have project using district steam. We use DES v2 to calculate the virtual rate based on state averaged electricity (0.084$/kWh) and gas (0.00757$/MBTU).

1
Thu Mar 5, 2015, 5:14 pm

Wastewater treatment plant offsite

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  LEED Pro Consultant  on 

Hello all, We are working on an industrial facility project were the wastewater treatment plant is offsite the project.

0

Plant Design for Proposed bldg

NC-2009 EAp2:Minimum Energy Performance
posted by  Julian Park  on 

If a new building will be served by an existing chiller plant that already serves an existing building, does the Plant design for the Proposed Alternative need to model the full chiller size, even

1
Thu Mar 5, 2015, 5:35 pm

Fabricator's location

NC-2009 MRc5:Regional Materials
posted by  Mahsa Nicknam  on 

IF the manufacturer's location is within 500 miles however fabricator's location is not, does it still have contribution to this credit OR not? In another word, when manufacturer location is withi

1
Sun Mar 15, 2015, 5:57 pm

EAp2:Table 1.4 based on ASHRAE 90.1-2010

CS-v4 EAp2:Minimum energy performance
posted by  CHRISTOPHE MATHIEU  on 

Hi all, I have a project CS LEED v4 and I couldn't found a table 1.4 with the new 90.1-2010 Standard on the LEED website. I have read that I can present the table 1.4 based on 90.1-2007 standard

1
Tue Apr 14, 2015, 1:47 pm

MPR 6 & USGBC Energy and Water Data Release form

NC-2009 MPR6:Must commit to sharing whole-building energy and water usage data
posted by  Katie Peterschmidt  on 

Could we get a confirmation on whether the utility release form is still applicable?

1
Tue Jun 9, 2015, 10:03 pm

Shuttle Service

CI-2009 SSc3.1:Credit Alternative Transportation—Public Transportation Access
posted by  Kalyan Nishtala  on 

Hi, To achieve this credit for our project, providing a shuttle service is the only way. I have a couple of question regarding the same: 1.

1
Fri May 22, 2015, 3:46 pm