Forum quick links
Acceptable methods of Glare Control
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Paul Rogers on
I know that glare control is a requirement for each window.
Bicycle & Changing rooms in basement , 200 yards
CS-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Deepika Parmar on
Our project consists of three buildings connected through the basement and is registered under campus development. We are providing bicycle racks and shower changing rooms in the basement.
High-Volume vs. Convenience Copier 5,000 pages - CIR 872 Canada
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Lindsey Kindrat on
Heads up for those working on LEED Canada NC 2009 projects, CIR 872 ruled 5,000 pages per month as the definition limit for a convenience copier. Ruling provided 2012-06-08.
District virtual rate:
NC-2009 EAp2:Minimum Energy Performanceposted by Haojie Wang on
We have project using district steam. We use DES v2 to calculate the virtual rate based on state averaged electricity (0.084$/kWh) and gas (0.00757$/MBTU).
Wastewater treatment plant offsite
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by LEED Pro Consultant on
Hello all, We are working on an industrial facility project were the wastewater treatment plant is offsite the project.
Plant Design for Proposed bldg
NC-2009 EAp2:Minimum Energy Performanceposted by Julian Park on
If a new building will be served by an existing chiller plant that already serves an existing building, does the Plant design for the Proposed Alternative need to model the full chiller size, even
Fabricator's location
NC-2009 MRc5:Regional Materialsposted by Mahsa Nicknam on
IF the manufacturer's location is within 500 miles however fabricator's location is not, does it still have contribution to this credit OR not? In another word, when manufacturer location is withi
EAp2:Table 1.4 based on ASHRAE 90.1-2010
CS-v4 EAp2:Minimum energy performanceposted by CHRISTOPHE MATHIEU on
Hi all, I have a project CS LEED v4 and I couldn't found a table 1.4 with the new 90.1-2010 Standard on the LEED website. I have read that I can present the table 1.4 based on 90.1-2007 standard
MPR 6 & USGBC Energy and Water Data Release form
NC-2009 MPR6:Must commit to sharing whole-building energy and water usage dataposted by Katie Peterschmidt on
Could we get a confirmation on whether the utility release form is still applicable?
Shuttle Service
CI-2009 SSc3.1:Credit Alternative Transportation—Public Transportation Accessposted by Kalyan Nishtala on
Hi, To achieve this credit for our project, providing a shuttle service is the only way. I have a couple of question regarding the same: 1.