Forum quick links
LEED Boundary
CS-2009 PIf4:Schedule and Overview Documentsposted by CT G on
We are working on a project that includes a building and open space surrounding it.
SSc10 as an ID strategy in NC
NC-2009 IDc1:Innovation in Designposted by Tiffany Moore on
Under the category of borrowing credits from other rating systems, I am looking at the potential to use the "Joint Use of Facilities" credit from Schools as an ID credit for NC. The project is a h
PC 9 - Open & Connected Community
Pilot-Credits PC9:Street Networkposted by Michael Kollman on
It seems like this is a useful metric to measure pedestrian options in the spirit of quantifying alternatives to vehicular travel.
Appropriate Zoning and Controls Questions
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Patrick Salmon on
We have an open office VAV project that is only pursuing the "Appropriate Zoning and Controls" portion of Option 1.
Air testing
Healthcare-v2009 IEQc5:Indoor chemical and pollutant source controlposted by Gustavo De las Heras Izquierdo on
Is air testing an acceptable approach to demonstrate that both outdoor and indoor contaminants are below the limits listed in the table?
USGBC Approved Standard for International Projects
NC-2009 EAp2:Minimum Energy Performanceposted by Maya Karkour on
Dear All, As part of the Alternative Compliance Path, "Projects outside the U.S.
Which tool should we use for LEED (NC? Homes?)
posted by Eunju Park on
We are trying to achieve LEED for Resort club, but there is "back of house complex" of which facilities include admistration centre, central laundry, medical clinic, transport depot, maintenance d
Commercial kitchen handwashing
CI-2009 WEp1:Water Use Reduction—20% Reductionposted by Jatuwat Varodompun on
In a restaurant, we have a foot padel hand washing for food preparation of restaurant staffs. Does it require to include this equipment in the calculation by using baseline of 0.5 gpm?
Query Regarding use of Treated RO reject water from ETP for WEP1
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Ashwin Kumar on
We plan to use RO Reject Water which is generated from within the LEED project Boundary for a Factory Project (registered within a Master Site Campus) towards the Flushing requirement. As mentioned
In which construction phase can I certify my building?
CS-2009 SSp1:Construction Activity Pollution Preventionposted by Hazem Yusuf on
Construction phase of an office building is consisting of multi stages.