Forum quick links
Preferred Parking on two different garage floors
CS-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Loreana Marciante on
On our project all the parking is underground. Rather than placing all preferred spots on one floor we would like to stack them over two floors close to the parking elevator.
proceed to post-certification on master site application?
posted by KIMBERLY KRAFT on
I have a Master Site application that is currently in Design and Construction application decision.
VRV System
CI-2009 IEQp1:Minimum IAQ Performanceposted by SW LEE on
Hi, My project is using VRV system for cooling.
GFA and other usage types on underground parking storey
posted by Maciej Starewicz on
This isue can be very confusing when it comes to detail. 1. Gross floor area (based on ASHRAE definition) sais that the calculation "excludes floor area dedicated to the parking and circulation of
Required signatories of whom?
NC-2009 EAp2:Minimum Energy Performanceposted by Ricardo Sá on
In the newest version (v4) of the LEED forms and specifically on the form for this credit there are several required signatories, however, there isn't any information regarding of who is supposed t
updated moderation rules for this page
posted by Tristan Roberts on
Some good discussion on this page -- thanks all.
Eligibility of PV systems receiving SRECs
NC-2009 EAc2:On-Site Renewable Energyposted by Adam Prince on
I apologize if this was covered explicitly in another discussion. In Massachusetts, there's a well-established SREC market.
Senior Living Community - Multiple Registrations really needed?
posted by Werner Maassen on
Our project entails an existing Senior Housing and Care Campus in California consisting of 10 buildings. Our client/owner/operator wants to achieve LEED Silver for 6 of the buildings which will be
Existing systems modeling
NC-2009 EAp2:Minimum Energy Performanceposted by Tiffany Moore on
If a project retains existing mechanical systems, but the overall scope of the renovations meets the new construction threshold, are the baseline calcs based on code-minimum or should the project a
Sidewalk clarification
Pilot-Credits PC14:Walkable Streetsposted by Michelle Oishi on
One of the requirements states, "At-grade crossings with driveways account for no more than 10% of the length of sidewalks within the project".