NC-2009 SSp1:Construction Activity Pollution Preventionposted by FABIO VIERO on
We are looking for other LEED experiences regarding an unexpected discovered archaeological finds during the excavation inside the and how we can treat this argument for SSP1.
ULEF Composite Wood
NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Rachel Sowards on
After reading through the threads above, I didnt see a clear cut answer. Can I use ULEF composite wood on my LEEDv2009 job for IEQc4.4?
Tenant Contribution to LEED-CS
posted by Andrew Ellsworth on
We have a project that is being built by a developer with a single tenant in mind.
surfaces of the zones
NC-2009 EAc1:Optimize Energy Performanceposted by Francesco Passerini on
In my models (both proposed models and baseline models) the surfaces of the zones are from the inside edge of the external walls to the center of the internal partitions.
IDc1.3
EBOM-2009 SSc3:Integrated Pest Management, Erosion Control, and Landscape Managementposted by Scott Volmer on
How do I get a LEED-EBOM 2009 SSc3 prerequisite form?
VRP Compliance Calculator Error
Healthcare-v2009 IEQp1:Minimum indoor air quality performanceposted by Kevin Chow on
I opted to use the LEEDonline provided VRP Compliance Calculator to show compliance with the IEQ p1. Upon completion of the form it says I am not compliant.
Separating lighting metering from plug load metering.
CS-2009 EAc5.1:Measurement and Verification—Base Buildingposted by Rudolph Carneiro on
I have seen many comments in this forum stating that plug loads should be metered seperately from lighting loads. I'm not sure if seperating these loads is actually necessary.
Major refurbishment - existing building
NC-2009 SSc7.2:Heat Island Effect—Roofposted by Alicia Freire on
Can this credit not be achieved in an existing building where one floor (not the top floor) is being assessed and the existing roof will be left untouched?
Labs21 Issue
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Eddie Cuevas on
I am working on a LEED-EBOM project that does not qualify for a Portfolio Manager rating due to the fact that lab space makes up more than 10% of the building area.
definition of 'mixed use'?
NC-2009 PIf2:Project Summary Detailsposted by emily reese moody on
Hi, We have a CS project that will have retail space on the ground level floor, and office space for the rest of the building.