Log in
Forum » NC-v4 EQc1
Topic

Entryway systems in airports

NC-v4 EQc1: Enhanced indoor air quality strategies
posted by Ricardo Sá on Nov 30, 2018, 4:58 am

https://leeduser.buildinggreen.com/forum/regularly-used-exterior-entrance Log in or register to post comments David Posada Integrated Design & LEED Specialist SERA Architects LEEDuser Expert 1980 thumbs up August 30, 2019- 2:41 pm I agree with Allan that any entries...

Last reply: David Posada, Aug 30, 2019, 2:41 pm

Paint Storage

NC-v4 EQc1: Enhanced indoor air quality strategies
posted by Summer on Jul 21, 2019, 5:52 am

Does paint storage room is included in the requirement of interior-cross contamination prevention requirement?

Last reply: Summer, Jul 25, 2019, 5:00 am

Entryway system extends into elevator

NC-v4 EQc1: Enhanced indoor air quality strategies
posted by Angela Barreto on Jul 12, 2019, 5:25 pm

Hi,

we have a project with a complying entryway system at ground level. However, the LEED reviewer has pointed out an entryway system is also required at the elevator lobby in our...

Entryway systems- Revolving doors?

NC-v4 EQc1: Enhanced indoor air quality strategies
posted by Allan Robles on May 22, 2019, 12:11 am

Hi LEED User-verse,

I have a project with a revolving door that is a...

Last reply: Allan Robles, Jun 19, 2019, 6:28 pm

Dedicated Exhaust Fan and Pressure calcalation

NC-v4 EQc1: Enhanced indoor air quality strategies
posted by Boggarm Setty on Apr 22, 2019, 4:58 am

1. Interior Cross-Contamination Prevention section requires exhaust from space where hazardous gases or chemicals may be present or used so does this exhaust need to be via dedicated...

Last reply: Bipin Karki, May 16, 2019, 7:36 am

Option 1 Requirements

NC-v4 EQc1: Enhanced indoor air quality strategies
posted by Yodi Danusastro on May 10, 2019, 7:15 am

Do we have to meet all the requirement in Option 1 as in mechanically ventilated spaces: A.the Entryway system strategy, B. Interior-cross-contamination prevention, and C. Filtration (...

Last reply: Bipin Karki, May 15, 2019, 2:13 pm

Separation of space requirements if stove is separately vented

NC-v4 EQc1: Enhanced indoor air quality strategies
posted by Ann Kelly on Mar 27, 2019, 4:40 pm

All,

If we have an electric residential grade stove, which is separately vented, located in an open break room setting, will this satisfy the requirements for separation of space?

...

BAS required for strategy "C. CO2 Monitoring"

NC-v4 EQc1: Enhanced indoor air quality strategies
posted by Gustavo De las Heras Izquierdo on Mar 3, 2019, 5:24 pm

Hi all,

The Reference Guide says:

"C. Carbon Dioxide Monitoring

Monitor CO2...

Enhanced IAQ- EP for 2 strategies under Option 2?

NC-v4 EQc1: Enhanced indoor air quality strategies
posted by Teresa Stern on Jan 15, 2019, 6:11 pm

We are looking at installing CO2 monitoring at densely occupied spaces. We are also providing a dust collection system...

Last reply: Teresa Stern, Jan 15, 2019, 6:13 pm

final fit-out on tenants request-> designing provisions for negative pressure difficult

NC-v4 EQc1: Enhanced indoor air quality strategies
posted by Mark Kumar Bose on Jun 3, 2018, 6:12 pm

Hi,

how do deal with the fact that often the final office floor plans will be fixed later on tenant request so that the technical provisions (negative pressure, etc.) for copy rooms can...

Last reply: Mark Kumar Bose, Jan 14, 2019, 2:56 pm