Fri Sep 2, 2011, 2:18 pm

Policy, "Measurement and Records"

EBOM-2009 MRp1:Sustainable Purchasing Policy
posted by  Dennis Palmer  on 

The example provided for each policy specifically states measured values, for example Durable Goods Procurement measured value is within a given year at least 40% of the purchase shall be energy st

2
Thu Sep 1, 2011, 7:56 pm

Appropriate Fenestration U-value for Baseline Model

NC-2009 EAp2:Minimum Energy Performance
posted by  PATRICK CORRIGAN  on 

I can not tell, from either ASHRAE 90.1-2007 or from the LEED User's Manual, what U-value I am supposed to use for the baseline vertical glazing.

2
Thu Sep 1, 2011, 7:40 pm

Dewatering

posted by  Daniel Bulley  on 
2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Wed Aug 31, 2011, 9:40 pm
4
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Wed Aug 31, 2011, 5:43 pm

Recycled Steel content

NC-2009 MRc4:Recycled Content
posted by  Katie Ellsworth  on 

We have several steel items that have been purchased for our contractors project. Most of the items show a total recycled content, then a post- and pre-consumer recycled content.

5
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Wed Aug 31, 2011, 4:42 pm

Multi-family residential - ASHRAE 62.1 2007 - ch. 5 Natural Vent

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Michele Helou  on 

We have a mixed use retail - residential project with the residential units relying on natural ventilation with the required 4% operable window area to floor area ratio.

2
Principal, Energy and Engineering Leader
DLR Group | Westlake Reed Leskosky
LEEDuser Expert
267 thumbs up
Wed Aug 31, 2011, 1:55 pm
5
Sustainability Consultant
Skanska Czech Republic
LEEDuser Basic Member
128 thumbs up
Wed Aug 31, 2011, 12:42 pm
7
Default Avatar
Owner
The EcoLogic Studio
LEEDuser Basic Member
37 thumbs up
Tue Aug 30, 2011, 2:02 pm

LEED Certification for Phase wise construction

NC-2009 MRc4:Recycled Content
posted by  Ramesh Narayanan  on 

Dear Sir/Madam, I have few clarification of whether the old constructed portion material should be considered for all the materials credits. Project Details: The building has been developed by t

2
CEO
Green Commons, LLC
LEEDuser Expert
586 thumbs up
Tue Aug 30, 2011, 5:50 am