Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

rating system and credit

General forums
posted by  Tristan Roberts  on 

Hi Christopher, can you ground this discussion in a specific LEED rating system and credit? I am not sure if there is a Homes vs.

2
Default Avatar
GBWorks
LEEDuser Basic Member
8 thumbs up
Wed Sep 21, 2011, 3:30 pm

Too much Window Area (WA)?

Schools-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Rebecca Griffith  on 

Is it possible to have too much window area, therefore disqualifying a room from being included in the total daylit area?

12
b.i.g. Bechtold DesignBuilder Expert
LEEDuser Basic Member
581 thumbs up
Wed Sep 21, 2011, 12:51 pm

LEED 2009 for New Construct, Optimize Energy Perform - EA CR 1

NC-2009 EAc1:Optimize Energy Performance
posted by  John Harrington  on 

I have two buidings on the same site/project boundry. Do I model the two buildings as one building?

2
Mon Sep 19, 2011, 8:40 pm

Energy coming from a off-site own renewable source

NC-2009 EAp2:Minimum Energy Performance
posted by  Jose Salinas  on 

Our project involves a production plant for pasta and support facilities in Santiago, Chile.

2
Principal
Emerald Built Environments
LEEDuser Basic Member
900 thumbs up
Mon Sep 19, 2011, 5:26 pm

Residential apartments Lighting Power Density

NC-2009 EAp2:Minimum Energy Performance
posted by  Sustainability Provider  on 

Dear All, I'm working on a residential apartments project and I'm trying to figure out what ASHRAE 90.1-2007 mandates as maximum lighting power density for this kind of projects.

2
Director of Commissioning & Critical System
Edwards & Zuck
LEEDuser Basic Member
29 thumbs up
Mon Sep 19, 2011, 4:16 pm

Construction Details in Baseline Model

NC-2009 EAp2:Minimum Energy Performance
posted by  Xing Shi  on 

In ASHRAE90.1-2007, the construction type and U value of Baseline Model is regulated.

2
Mon Sep 19, 2011, 4:06 pm

case 2. Residential and Hospital Projects Only - Requirements

NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Veronika Sundberg  on 

Hi, I have a question regarding case 2. Residential and Hospital Projects Only. In the requirement for the prerequiset 8 bullets are listed that needs to be met.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Mon Sep 19, 2011, 9:12 am

Energy Bills are the Entire Site and Not Broken Down by Building

EBOM-2009 EAp2:Minimum Energy Efficiency Performance
posted by  Cynthia Fowler  on 

My project building is one of 40+ on a company's campus/site. They do not purchase electricity on a building-by-building basis, but for the entire site.

4
Fri Sep 16, 2011, 7:30 pm
4
CEO
Green Commons, LLC
LEEDuser Expert
586 thumbs up
Fri Sep 16, 2011, 11:50 am

MR Credit - Environmentally Preferable Structure and Enclosure

General forums
posted by  Keith Lindemulder  on 

First - PLEASE bring back some kind of number system like MR4, MR5, whatever...these credit names are too difficult to remember and differentiate.

3
CEO
Green Commons, LLC
LEEDuser Expert
586 thumbs up
Thu Sep 15, 2011, 7:35 pm