Forum quick links
Can CARB’s ATCM 93120 (2008).
NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Summer Gorder on
Can CARB ULEF (Ultra Low Emitting) composite wood ceiling tiles that meet ATCM 93120 (2008) comply with IEQ credit 4.4?
Tenant with LEED ID&C Certification is moving spaces in building
CI-2009 PIf5:Previously LEED Certified Detailsposted by Summer Gorder on
If a tenant moves spaces within the same building, but would like to maintain their LEED ID&C certification, does anything transfer over to certify their new space?
Group projects w/ DES / central plants
CS-2009 EAp2:Minimum Energy Performanceposted by Stacey Olson on
This is with regard to an open air shopping plaza, which is registered as a group project with 7 structures. We received guidance to follow the “Treatment of District or Campus Thermal Energy in
Energy Submetering
EBOM-v4 EAc5:Advanced energy meteringposted by VISHESH AGARWAL on
I am working on EB Project in LEED V4. In V4 the advance sub-metering is required 1. Chilled water System: Chiller and Chilled water pumps 2.
Air Cooled Chiller Vs Water Cooled Chiller With Dry Air Cooler
CS-2009 EAp2:Minimum Energy Performanceposted by Ciaran McCabe on
Has anyone any feedback in modelling either of these two chillers in a 90.1 Energy model.
Occupancy Category
EBOM-v4 EQp1:Minimum indoor air quality performanceposted by Meier Corporate Account on
I am working through the Minimum IAQ Performance calculator and I need a recommendation.... Our facility is 105,000 quare feet (ground level).
return fan for PTAC
NC-2009 EAp2:Minimum Energy Performanceposted by Francesco Passerini on
G3.1.2.8 states: "If return or relief fans are specified in the proposed design, the baseline building design shall be also be modeled with fans serving the same functions (...)".
decorative allowance
CI-2009 EAc1.1:Optimize Energy Performance—Lighting Powerposted by Ron Dean on
we have a project with a led strip only for decorative purpose and not included in the luxes calculus. This led strip is located on the ceiling illuminating the roof.
Heat Island Reduction
EBOM-v4 SSc3:Heat island reductionposted by VISHESH AGARWAL on
Dear All, Can I take option-2: Roof (1 Points) and option-4: Parking Under Cover (1 Points) Simultaneously for achieving 2 points under this category OR we need to use option-3 for targeting the 2
Tile finishes for flat roof
CS-2009 SSc7.2:Heat Island Effect—Roofposted by Magda Aghababyan on
We are working project C&S the client need to use white colour ceramic tile on roof top.Should need to test it ? and value has to be more than 78 for the flat roof ?