Topic | Recent |
---|---|
Definition "individual energy end use"?NC-v4 EAc3: Advanced Energy Meteringposted by Lise Dannesboe on Jan 6, 2017, 5:58 am
Hi, i went though all the comments on this forum and cannot really find a clear answer to the question i have when i read the sentence: "any individual energy end uses that represent 10% or more... Last reply: Marcus Sheffer, Mar 4, 2021, 9:38 am |
|
Fans as an End UseNC-v4 EAc3: Advanced Energy Meteringposted by Pooja Sannamani on Jan 6, 2021, 7:01 pm
Hi, we'd like to make sure we are meeting the intent of the credit correctly when it comes to fans. We use IES for energy models which typically breaks fans into meters for exhaust fans... Last reply: Pooja Sannamani, Jan 8, 2021, 5:16 pm |
|
Tenancy areas with low relevanceNC-v4 EAc3: Advanced Energy Meteringposted by Ricardo Sá on Sep 22, 2020, 1:08 pm
Dear All Last reply: Marcus Sheffer, Nov 13, 2020, 10:16 am |
|
IT Room Space CoolingNC-v4 EAc3: Advanced Energy Meteringposted by Mark Zoeteman on Sep 3, 2020, 11:20 am
Reference Guide states under Data Center heading: IT energy consumption, as measured from an uninterruptible power supply (UPS) output meter, should be metered separately from non-IT equipment,... Last reply: Marcus Sheffer, Nov 10, 2020, 11:47 am |
|
Integrated chiller controls and VFD pumpsNC-v4 EAc3: Advanced Energy Meteringposted by Crina Bosch on Sep 9, 2020, 12:10 pm
We are working on a project that has a chilled water plant that consists of variable speed chillers and pumps with associated VFDs. Both the integrated chiller controls and the pump VFDs have... Last reply: Marcus Sheffer, Sep 9, 2020, 1:14 pm |
|
AHU lighting and convenience ReceptacleNC-v4 EAc3: Advanced Energy Meteringposted by Mike oliva on Aug 20, 2020, 10:14 am
We are needing some help w/ the finer details of metering and complying with the requirements of this credit but also trying to be rational about the extent we need to go for metering the end... Last reply: Marcus Sheffer, Aug 20, 2020, 4:35 pm |
|
EA Advanced Energy MeteringNC-v4 EAc3: Advanced Energy Meteringposted by Donald Green on Apr 21, 2020, 4:46 pm
I would like to clarify how a small project can comply with advanced energy metering. In the LEED Reference Guide there is a paragrpah that speaks to End Uses beign grouped by occupancy type...... Last reply: Gilbert John, May 5, 2020, 11:43 am |
|
LightingNC-v4 EAc3: Advanced Energy Meteringposted by Pooja Sannamani on Nov 20, 2019, 3:29 pm
Hi, my project is in design and current proposes to meter lighting and exterior lighting together. The exterior lighting is very small so the electrical engineer is pushing on whether we really... |
|
Using EMS to calculate some End-Use EnergyNC-v4 EAc3: Advanced Energy Meteringposted by Melissa Crowe on Oct 30, 2019, 6:47 pm
Hi All We have metering set up for most of the end-uses that represent over 10% of total energy but for some equipment is it not cost effective or practical.
Last reply: Melissa Crowe, Oct 31, 2019, 4:03 pm |
|
Should meters by themselves hold data for 36 months?NC-v4 EAc3: Advanced Energy Meteringposted by Edgar Arevalo on Oct 10, 2019, 2:50 pm
To be clear, even though the reference guide states "The system must be capable of storing all meter data for at least 36 months", does that mean the energy meters should have capability or does... Last reply: Bipin Karki, Oct 11, 2019, 10:54 am |