Topic | Recent |
---|---|
IT Room Space CoolingNC-v4 EAc3: Advanced Energy Meteringposted by Mark Zoeteman on Sep 3, 2020, 11:20 am
Reference Guide states under Data Center heading: IT energy consumption, as measured from an uninterruptible power supply (UPS) output meter, should be metered separately from non-IT equipment,... Last reply: Marcus Sheffer, Nov 10, 2020, 11:47 am |
|
Integrated chiller controls and VFD pumpsNC-v4 EAc3: Advanced Energy Meteringposted by Crina Bosch on Sep 9, 2020, 12:10 pm
We are working on a project that has a chilled water plant that consists of variable speed chillers and pumps with associated VFDs. Both the integrated chiller controls and the pump VFDs have... Last reply: Marcus Sheffer, Sep 9, 2020, 1:14 pm |
|
AHU lighting and convenience ReceptacleNC-v4 EAc3: Advanced Energy Meteringposted by Mike oliva on Aug 20, 2020, 10:14 am
We are needing some help w/ the finer details of metering and complying with the requirements of this credit but also trying to be rational about the extent we need to go for metering the end... Last reply: Marcus Sheffer, Aug 20, 2020, 4:35 pm |
|
EA Advanced Energy MeteringNC-v4 EAc3: Advanced Energy Meteringposted by Donald Green on Apr 21, 2020, 4:46 pm
I would like to clarify how a small project can comply with advanced energy metering. In the LEED Reference Guide there is a paragrpah that speaks to End Uses beign grouped by occupancy type...... Last reply: Gilbert John, May 5, 2020, 11:43 am |
|
LightingNC-v4 EAc3: Advanced Energy Meteringposted by Pooja Sannamani on Nov 20, 2019, 3:29 pm
Hi, my project is in design and current proposes to meter lighting and exterior lighting together. The exterior lighting is very small so the electrical engineer is pushing on whether we really... |
|
Using EMS to calculate some End-Use EnergyNC-v4 EAc3: Advanced Energy Meteringposted by Melissa Crowe on Oct 30, 2019, 6:47 pm
Hi All We have metering set up for most of the end-uses that represent over 10% of total energy but for some equipment is it not cost effective or practical.
Last reply: Melissa Crowe, Oct 31, 2019, 4:03 pm |
|
Should meters by themselves hold data for 36 months?NC-v4 EAc3: Advanced Energy Meteringposted by Edgar Arevalo on Oct 10, 2019, 2:50 pm
To be clear, even though the reference guide states "The system must be capable of storing all meter data for at least 36 months", does that mean the energy meters should have capability or does... Last reply: Bipin Karki, Oct 11, 2019, 10:54 am |
|
Extracting Energy Consumption from the BASNC-v4 EAc3: Advanced Energy Meteringposted by Claire Kapusta on Sep 6, 2019, 12:02 pm
Hello, We are working on the design of a new office tower and we would appreciate some guidance on whether the following metering strategies are acceptable to qualify for the Advanced... |
|
Data Storage RequirementNC-v4 EAc3: Advanced Energy Meteringposted by Shannon Oletic on Jul 18, 2019, 2:04 pm
Hello, Most digital metering systems with remote access capabilities have a cloud-based system were data can be stored indefinitely, or until the meter becomes inactive. Looking... Last reply: Marcus Sheffer, Jul 19, 2019, 5:09 pm |
|
EAc3- Clarification on the Advanced Energy Metering.NC-v4 EAc3: Advanced Energy Meteringposted by Olawale Taiwo on Sep 5, 2018, 9:09 am
Hello All, There seems to be some challenges with clarity on the wording of this credit instructions, our team Electrical Engineer and I had this conversation and it became necessary to... Last reply: Marcus Sheffer, Feb 12, 2019, 6:51 pm |