Forum quick links
Greenfield
NC-v4 SSc2:Site development - protect or restore habitatposted by Lene Hill on
The site is about 47 acres of woods and meadow. It was at one time part of an estate and had a home, garden etc on it. This is where the new site is going.
use open space outside of project area
Healthcare-v4 SSc3:Open spaceposted by Lene Hill on
We have a project (building and parking lot) being built in a small master planned community. The community has several open spaces natural areas adjacent to the project with walking trails.&
Bath fill
posted by Tony Murphy on
Could you tell me please is there a full flow rate program available for Hotels / schools and commercial office style projects I am trying to prepare a specification proposal for a Hotel
One EPD for Multiple Products
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Adam Yarnell on
Hi LEEDuser Experts!
Forum index in front of pay wall
posted by Shane Totten on
Hey, all. Confirming the forum index on the front side of the pay wall will be searchable. Thanks.
How does this Pilot Credit work?
Pilot-Credits EQpc85:Learning Controls for Thermal Comfortposted by Shannon Brown on
I have no experience with this pilot program, so naturally I'll have a couple questions rather than comments.
Minimal requirements to meet Bicycle Facilities
NC-v4 LTc6:Bicycle facilitiesposted by Pournamasi Rath on
Hi,
How to Model unit heater in Basel & Proposed model following 90.1-2010?
Mid-Rise-v4 EAp2:Energy meteringposted by soham babu on
In my Proposed model(Design) I have DOAS with gas heating, VRF Fan coil units & Electric Unit heaters. following ASHRAE-90.1-2010,