Forum quick links
LEED project boundary
CS-v4 MPR2:Must use reasonable LEED boundariesposted by Francesco Passerini on
The site area of our project has some differences between ground floor and the basement: the basement area is higher than the ground floor area.
Clarification on Baseline Equipment Efficiency Tables for Systems 2, 4, and 6 (ASHRAE 90.1-2010)
NC-v4 EAp2:Minimum energy performanceposted by Anurag Ghosh on
Hello everyone,
MRpc103 - Integrative Analysis of Building Materials in NC 2009
NC-2009 IDc1:Innovation in Designposted by Sara Goenner Curlee on
I recently completed the work effort for MRpc103 - Integrative Analysis of Building Materials for a v4 project, and had a v2009 project with an open innovation credit.&nbs
Helpful links to complete Site Assessment worksheet
NC-v4.1 SSc1:Site Assessmentposted by Micah McLain on
Which websites do you all use to complete your Site Assessment worksheets for US-based projects?
Visitability requirements for multiunit redsidential towers with several stories ?
ND-v4 NPDc11:Visitability and universal designposted by Marine Petrosyan on
Hi, All!
Open-grid pavement system - is gravel inside the openings compliant?
NC-v4 SSc5:Heat island reductionposted by Aleksandra Prawda on
Hi all,
Land clearing debris
NC-2009 MRc2:Construction Waste Managementposted by Kelly Humphry on
I understand that LEED does not count land clearing debris in its construction waste recycling numbers, however, it also does say in the manual that "any construction debris processed into a recycl
Internal Connectivity of a 3ha ND project. How to calculate?
ND-v4 NPDp3:Connected and open communityposted by Marine Petrosyan on
Hi, All!
Dear Community,
Welcome to the LEEDuser job board
posted by Paula Melton on
Hi! This job board is a new feature we're trying out here at LEEDuser.
Prescriptive Compliance - Documentation?
CI-v4.1 EAp2:Minimum Energy Performanceposted by Edgar Arevalo on
So how should one pursue the prescriptive method for this prerequisite? In the sample form, it says to provide documentation demonstrating compliance with ASHRAE 90.1-2016, Sections 5 though