Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Environmental Site assessment for non-school project

Schools-NC-v4 SSp2:Environmental site assessment
posted by  Peter Doo  on 

We are doing a project involving renovation of an existing building and an addition. It is not a school but we have done the assessments to identify hazmats in the existing building.

1
Thu Nov 29, 2018, 1:55 pm

ASHRAE 90.1.2010 and unmet hours

NC-v4 EAc2:Optimize energy performance
posted by  Konstantina Kalliakoudi  on 

Hello to all,

I have following questions concerning  ASHRAE 90.1.2010 and unmet hours:

2
Default Avatar
Director of Sustainability
Edifícios Saudáveis Consultores (503 910 767)
LEEDuser Basic Member
79 thumbs up
Thu Oct 18, 2018, 2:10 pm

Prevention Through Design

Healthcare-v4 INc1:Innovation
posted by  Katherine Zanecosky  on 

Hi fellow LEED Users?

 

Has anyone else attempted the Prevention Through Design credit?  If so,

 

1
Tue Jun 24, 2025, 7:42 am

Can landscape pools be classified as Nonroof measures

NC-v4 SSc5:Heat island reduction
posted by  DAVE LI  on 

I am applying for the LEED V4 BD + C new building certification, SSc5 Heat island reduction, and there is a design landscape pool (with water storage function and rainwater recovery) around th

1
Fri Oct 19, 2018, 3:16 am

Attached building within the LEED boundary

NC-v4 MPR2:Must use reasonable LEED boundaries
posted by  Omar Elrawy  on 

I have a site with existing buildings, and I will attach a new building intended for LEED certificate to the existing buildings, which aren't pursuing LEED.  I need to know if that compli

0

Definition of Material Streams

NC-v4 MRp2:Construction and demolition waste management planning
posted by  Christopher Russell-King  on 

Hello, we are currently working on a new building under LEED V4, and we have doubts regarding what is considered a material "stream".

8
Wed Oct 17, 2018, 7:07 pm

Universal Notification Requirements

EBOM-2009 SSc3:Integrated Pest Management, Erosion Control, and Landscape Management
posted by  Kristen Paradiso  on 

What needs to be included in a universal notification about a Tier 2 pesticide application? I've found old documentation stating a "Signal Word" needs to be included. Is this still required?

1
Wed Oct 17, 2018, 3:33 pm
7
Principal
KieranTimberlake
LEEDuser Basic Member
3 thumbs up
Wed Oct 17, 2018, 2:41 pm

Diferent product references of one of several brands in same EPD

NC-v4 MRc2:Building product disclosure and optimization - environmental product declarations
posted by  Ricardo Sá  on 

Hi All,

According to LEED BD+C_V4 “EPD type III (specific product) it counts as one single product.”.

3
Default Avatar
Director of Sustainability
Edifícios Saudáveis Consultores (503 910 767)
LEEDuser Basic Member
79 thumbs up
Wed Oct 17, 2018, 10:29 am