ND-v2009 NPDc8:Transportation demand managementposted by MAUDE PINTAL on
Hi,
When I calculate the daily trips of bus lines, do I need to add the numbers of trips, for example east + west ? considering that each direction is at a different bus stop.
LEEDCoach Response to ITE questions
CI-v4 LTc5:Reduced parking footprintposted by emily reese moody on
Hi all,
I posed the following questions to LEEDCoach, and got the responses below.
Secure Facilities
Schools-NC-v4 SSc8:Joint use of facilitiesposted by Lisa Logan on
Is it no longer a requirement to lock down parts of the building in order to meet this credit?
Is inputting meters in the Whole Building model a MBCx requirement?
NC-v4 EAc1:Enhanced commissioningposted by Lise Dannesboe on
Hi.
Running Exhaust Into Energy Recovery Wheel
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Neil Sen on
Are we allowed to run exhaust from areas like trash rooms into an energy recovery wheel and still achieve this credit?
Rainwater Management through BMP
NC-v4 SSc4:Rainwater managementposted by Jamé Wills on
I have an 8 acre site that is largely buildings and roadway, is it possible to achieve this credit with the use of French drain (exfiltration trenches)?
Bike Share Program
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Jennifer Preston on
Since LEED came along many cities (DC, NYC,BOSTON) have now added bike share programs.
Restrictions on water retention due to Tidal Wetlands
NC-v4 SSc4:Rainwater managementposted by Pournamasi Rath on
Hi,
Expiration date on Green Label Plus
CS-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Lise Dannesboe on
Hi. Is there a requirement to the expiration date of the certification? We just recevied a carpet with a Green Label plus certificate, which has an expiration date on the 31of decmeber 2017.
Modular and Panelized construction
Mid-Rise-v4 MRc3:Construction waste managementposted by Michael Browne on
How should recycled and total waste be calculated and documented for v4 LEED Homes Midrise projects with off-site construction such as panelized walls, trusses, and modular projects?