Forum quick links
50% of Receptable Controls to meet the Prerequisite
NC-v4 EAp2:Minimum energy performanceposted by Kritika Kharbanda on
We are working on a project where it was missed during equipment procurement that open office furniture is required to have 50% of the receptacles controlled to meet the prerequisite under 90.1-201
Comprehensive Composting
NC-v4 INc1:Innovationposted by Alma Evans on
Hi there, I registered the project I worked on in Austin, TX - Govalle Elementary School for the comprehensive composting pilot innovation point and I want to thank AISD for providing the requ
Applicability of Rainwater Management Credit – Direct Discharge to Natural Stream
NC-v4 SSc4:Rainwater managementposted by Ahmed Alyousef on
We are seeking clarification on the applicability of the Rainwater Management credit based on our current stormwater strategy.
Use High Priority Site as Innovation
CS-v4 LTc3:High priority siteposted by Sara Johansson on
Hello, I have a CS v.2009 project and wish to use the High Priority v.4 credit as an innovation credit.
Thermal comfort - individual Occupancy – LEED Credit Consideration
NC-v4 EQc5:Thermal comfortposted by Jayaprakash Murali on
Hello,
What is the Process for EPR Registration in India?
posted by Bl India on
EPR Registration in India is a structured process regulated by the Central Pollution Control Board to ensure responsible waste m
BIS ISI Certificate Consultant in South Korea – Reliable Support for Export to India
posted by BIS Certification on
South Korean manufacturers exporting products to India must obtain BIS ISI certification for regulated items. This certification ensures compliance with Indian safety and quality standards.
TEC Certification Consultant in Singapore – Hassle-Free Telecom Compliance for India
posted by BIS Certification on
TEC certification is required for telecom and networking equipment exported to India under the MTCTE framework.