Forum quick links
Ventilation Openings
CS-2009 IEQp1:Minimum indoor air quality performanceposted by TOMAS URIBE on
Hello. We are working on a Core & Shell project, it has retail spaces that consists of two levels each one.
Default or maximal fixture uses ? flow restrictors ?
NC-2009 WEp1:Water use reductionposted by Nicolas MOLLE on
Hello, I have two questions about this prerequisite: 1st. Are the flow described in the baseline a maximum flow for the project ?
Building for a single tenant but with laboratories and offices
posted by Nicolas MOLLE on
Hello, We are going to register a project for ALSTOM which contains: Offices, laboratories, restaurant and workshop in a whole building of nearly 30 000 m².
Showers for SSc4.2
CS-2009 WEp1:Water use reductionposted by BH . on
Hi, I have doubts regarding showers for bicycle racks calculations for WEp1.
Plastic waste
NC-2009 MRp1:Storage and collection of recyclablesposted by Nicolas MOLLE on
Hello, I would like if it's possible to sort plastic waste with other banal (common? I don't know the english word) industrial waste ? Or do we need a specific garbage ?
Recycling lbs per day
CS-2009 MRp1:Storage and collection of recyclablesposted by Kevin Short on
I am trying to determine how many pounds of recycling waste per day my building will generate. Any specific formula to use? It is a 55,000 sq ft office building.
[FR] Water Closet dual flush fixtures 2-4 l ?
NC-2009 WEc3:Water use reductionposted by Nicolas MOLLE on
Hello, To obtain -40%, we'd like to use (in France) Water Closet dual flush fixtures 2-4 liters.
Toilet Scope
CI-2009 WEp1:Water use reductionposted by sompoche sirichote on
If our client who own the entire building would like to do the fitout for only 1 floor.
Simulation: Baseline Chiller Part Load Performance
CS-2009 EAp2:Minimum energy performanceposted by Marco Abdallah on
We are pursuing Option 1 (Whole Building Simulation).
kitchen faucets
CS-2009 WEp1:Water use reductionposted by Alicja Bieszyńska on
We completed the Design Submittal when there was no tenants = no information on their fit-out space. Right now, one of our clients want to include additional tea room with kitchen sink.