Becomming LEED AP BD+C during LEED project

NC-2009 IDc2:LEED Accredited Professional
posted by  Roger Moquin  on 

I, Is it ok for LEED IDc2 if i become LEED AP BD+C just before the start of the project or late in the project. I am the administrator of the project. Thank you.

4
Founder & Community Director
Metricorps
LEEDuser Expert
7780 thumbs up
Fri May 16, 2014, 3:52 pm

Can a Graded Pad Site Meet SSp1?

NC-2009 SSp1:Construction Activity Pollution Prevention
posted by  Michael Hoffner  on 

Our client has purchased a graded pad site from a developer and wants to build a LEED certified project.

6
Regional Stormwater Leader
Arcadis North America
LEEDuser Expert
144 thumbs up
Fri May 16, 2014, 2:29 am

Do you have to memorize credit names AND numbers?

General forums
posted by  Elainna Wright  on 

Do you have you memorize the credit name associated with each credit number?

2
Sustainable Design Director, Associate Principal
Opsis Architecture
LEEDuser Premium Member
54 thumbs up
Thu May 15, 2014, 11:10 pm

Smoking on balconies in residential and hospitality projects

NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Heather DeGrella  on 

LEEDuser states that a project should ask itself "Will smoking be prohibited on all areas of balconies and decks, even for private residences and hotel rooms, that are within 25 feet of entries, o

7
Sustainable Design Director, Associate Principal
Opsis Architecture
LEEDuser Premium Member
54 thumbs up
Thu May 15, 2014, 5:41 pm

Choosing an HVAC system baseline for a Manufacturing Facility

NC-2009 EAp2:Minimum Energy Performance
posted by  Ashwin Kumar  on 

We are working on a manufacturing facility for which we are trying to choose the accurate HVAC baseline system for energy modelling. According to ASHRAE 90.1 2007 Table G.3.1.1A, looking at our co

3
Default Avatar
Sustainability Services Consultant
M+W Group
LEEDuser Basic Member
2 thumbs up
Thu May 15, 2014, 1:25 pm

Unoccupied Building

Data-Centers-NC-v4 MPR3:Must comply with project size requirements
posted by  Phillip Cook  on 

I am working on a datacentre that does not include any occupied areas and will have no regular staff on site - security and network support will be provided from an adjoining site.

3
Founder & Community Director
Metricorps
LEEDuser Expert
7780 thumbs up
Wed May 14, 2014, 11:42 pm

Cannot upload files on LEED scorecard

Living with LEED Online - quirks, bugs and hiccups
posted by  Julie Li  on 

Two weeks agao, I can upload files easily on the Scorecard. And then all of a sudden, I can't upload documents on Scorecard any more.

2
Default Avatar
President
Integra Contracting
LEEDuser Basic Member
2 thumbs up
Wed May 14, 2014, 7:16 pm

Trash can liner credit EBOM V4

Retail-EBOM-v4 EQc7:Green cleaning - products and materials
posted by  Marion Stecklow  on 

What is the credit requirement for trash can liners in EBOM v4?

2
Founder & Community Director
Metricorps
LEEDuser Expert
7780 thumbs up
Wed May 14, 2014, 2:11 pm

EMICODE - EC1 / EC1Plus

CI-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Michael Smithing  on 

Does anyone have experience with products tested and licensed under the German EMICODE VOC rating system? EC1 specifieds a maximum of 1000 micrograms/m3 (1 gram/liter) emission after three days.

5
Independent consultant on VOC issues
formerly with Eurofins Product Testing A/S
LEEDuser Basic Member
246 thumbs up
Wed May 14, 2014, 12:59 pm

Web-based Reference Guide

General forums
posted by  Noriko Nagazumi  on 

Has anyone bought the v4 Web-based Reference Guide? Is one subscription usable by different people in the same organization?

2
Founder & Community Director
Metricorps
LEEDuser Expert
7780 thumbs up
Wed May 14, 2014, 7:55 am