Forum quick links
How to know if im eligible for Option 1?
CS-v4 MRc1:Building life-cycle impact reductionposted by Marina Andrade on
While working on a Leed certificate Project, Me and my team stumbled against a interpretation issue.
Sustainable Sites
NC-v4 LTc1:LEED for Neighborhood Development locationposted by Kristina Pobre on
Is a project viable to get points for this credit (LTc1 LEED for ND location) if the project is Sustainable SITES certified?
WaterSense Labelling Alternatives
CI-v4 WEp1:Indoor water use reductionposted by Oliver Bate on
Hi! Toilet (Water Closet); Urinals; Private Lavatory Facuet; and Showerheads all need to be WaterSense Labelled. However- what are the equivalent labels?
International Products
EBOM-v4 EQc7:Green cleaning - products and materialsposted by JLL Sustainability Consulting on
I am working on projects in South and Central America, Middle East and the United Kingdom.
gross/net floor area for flush-out calculations
NC-v4 EQc4:Indoor air quality assessmentposted by Agnieszka Rylska on
I would like to confirm if flush-out calculations should be based on gross or net floor area of the building.
Can client provide testing of a product to show compliance?
NC-v4 EQc2:Low emitting materialsposted by emily reese moody on
My client is a university that asked if they could provide the testing required for products if it's not available from the manufacturers.
Spaces that are not in scope
NC-v4 EAp2:Minimum energy performanceposted by Edgar Arevalo on
I am currently working on an energy model for a major renovation project under LEED BD+C. There are two major spaces (both lunch rooms) that are not going to be served by the new HVAC sy
lengths of the permanent entryway systems
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Ydo Schuuring on
LEED v4 describes to install a permanent entryway systems at least 10 feet (3 meters) long in the primary direction of travel, to capture dirt and particulates entering the building at regularly us