LEED v4 BD+C, EAc1 Enhanced Cx, Option 2. Envelope Cx: Can General Contractor contract for the BECx testing?
NC-v4 EAc1:Enhanced commissioningposted by Theresa Lehman on
Has anyone come across a scenario where the general contractor is required to contract for the functional testing of the building envelope commissioning, where the hired BECx simply "observes" the
Number of spaces
NC-v4.1 LTc8:Electric Vehiclesposted by Norman Sutton on
I have a site with 124 parking spaces. For Option 1 the math points to needing 6.2 spaces (.05 x 124). To earn the credit, will chagring stations for 6 spaces be enough, or will 7
Taking account for thermal brigdingt of construction joints/egde
NC-v4 EAp2:Minimum energy performanceposted by Sonja Kildishev on
I wonder if/how thermal bridging of joints/egde between constructions should be included in the U-value of the construction?
Additional minimum requirement
Data-Centers-NC-v4.1 EAp2:Minimum Energy Performanceposted by Luis Andrade on
Hi everyone,
Save These Dates for the 2025 Super Summit
posted by Nadav Malin on
We're thrilled to announce that, for the first time, the 2025 Summits for each Peer Network will be hosted within one week and in a single location.
Quality Views Analysis Results is AutoCase
Pilot-Credits INpc113:Informing Design Using Triple Bottom Line Analysisposted by Mansoureh Jalali on
When I try to add my Views study results to AutoCase it asks for the type of view for both baseline and proposed design.
"Healthier" laboratory countertop
posted by Teresa Jan on
What do you specify for the laboratory countertop? Are there any healthier options I should suggest to my team? Thank you!
IAQ Calculator Space Categories
NC-v4 EQp1:Minimum indoor air quality performanceposted by Junaid Mujahid on
In some of our projects, we are providing outdoor air to some spaces which do not require outdoor air supply as per ASHRAE 62.1. For example, water tank room, some storages etc.
Should MAHUs be included in IAQ Calculator
NC-v4 EQp1:Minimum indoor air quality performanceposted by Junaid Mujahid on
In a Mall project, it has multiple kitchens/restaurants which have ecology units that exhaust air (fume hoods).