Two buildings on one project site
CS-2009 IEQp1:Minimum IAQ Performanceposted by James Lee on
Hi, I am James and am working on project with two buildings on one project site. In this case, should I fill out IEQp1 form separately like EAp2? Maybe someone already asked this question. But p
Option 2 Meaning of "Contiguous Area"
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Daniel Smith on
Some of the air handling units at the site (police station) where I will be conducting air testing serve more than one area on a given floor, and these areas are not directly connected to each othe
waste audit documentation
EBOM-2009 MRc6:Solid Waste Management—Waste Stream Auditposted by Fareed Alghimlas on
we are working on performing a daily waste audit for the building, my question is : do we document the outcomes of just one day of the waste audit during the performance period?
fixture group for toilet in a private office
EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Pablo Fortunato Suarez on
The project (office building) has a few private (executive) offices which have their own assigned private toilet. This is intended for use only by the assigned executive.
pantry sinks
EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Pablo Fortunato Suarez on
Is there a guideline for pantry sinks in office spaces?
Demolished Irrigation System
NC-2009 WEc1:Water Efficient Landscapingposted by Gregory Martin on
I am working on a renovation project on a college campus that has made efforts to be more sustainable.
Organic Fertilizer
EBOM-2009 SSc3:Integrated Pest Management, Erosion Control, and Landscape Managementposted by Andy Rhoades on
My landscaper is using a 100% Natural Organic component fertilizer with a ratio of 3-3-2.
Precertification - LEED 2009 Core & Shell
CS-2009 SSp1:Construction Activity Pollution Preventionposted by Michael Heacock on
We are working on submitting a precertification. I'd thought the credits team was working on were design phase. If I submit the precertification, can I quickly turn in for design phase.
Garage/service openings with driveway crossings at sidewalk
Pilot-Credits PC14:Walkable Streetsposted by Qiongwen Kong on
This is in regards to the requirements 6 and 7. 6 - No more than 20% of the street frontage includes garage or service bay openings. Alley access is used instead, if available.
Inconsistent Price Square Meters versus Square Feet
Pilot-Credits SSpc83:Offsite Financial Support for Habitat Protectionposted by Ben Stanley on
We're pursuing this pilot credit for an EBOM project and it looks like the stated price for financial support is inconsistent if your reporting site area in square meters ($0.5 /square meter) versu