Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Two buildings on one project site

CS-2009 IEQp1:Minimum IAQ Performance
posted by  James Lee  on 

Hi, I am James and am working on project with two buildings on one project site. In this case, should I fill out IEQp1 form separately like EAp2? Maybe someone already asked this question. But p

1
Wed Jan 18, 2017, 5:40 am

Option 2 Meaning of "Contiguous Area"

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Daniel Smith  on 

Some of the air handling units at the site (police station) where I will be conducting air testing serve more than one area on a given floor, and these areas are not directly connected to each othe

1
Mon Oct 31, 2016, 2:10 pm

waste audit documentation

EBOM-2009 MRc6:Solid Waste Management—Waste Stream Audit
posted by  Fareed Alghimlas  on 

we are working on performing a daily waste audit for the building, my question is : do we document the outcomes of just one day of the waste audit during the performance period?

1
Thu Nov 17, 2016, 10:19 pm

fixture group for toilet in a private office

EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiency
posted by  Pablo Fortunato Suarez  on 

The project (office building) has a few private (executive) offices which have their own assigned private toilet. This is intended for use only by the assigned executive.

1
Thu Nov 17, 2016, 10:37 pm

pantry sinks

EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiency
posted by  Pablo Fortunato Suarez  on 

Is there a guideline for pantry sinks in office spaces?

1
Wed Jan 18, 2017, 5:37 am

Demolished Irrigation System

NC-2009 WEc1:Water Efficient Landscaping
posted by  Gregory Martin  on 

I am working on a renovation project on a college campus that has made efforts to be more sustainable.

1
Fri Nov 18, 2016, 5:11 pm

Organic Fertilizer

EBOM-2009 SSc3:Integrated Pest Management, Erosion Control, and Landscape Management
posted by  Andy Rhoades  on 

My landscaper is using a 100% Natural Organic component fertilizer with a ratio of 3-3-2.

1
Tue Jun 6, 2017, 12:52 am

Precertification - LEED 2009 Core & Shell

CS-2009 SSp1:Construction Activity Pollution Prevention
posted by  Michael Heacock  on 

We are working on submitting a precertification. I'd thought the credits team was working on were design phase. If I submit the precertification, can I quickly turn in for design phase.

0

Garage/service openings with driveway crossings at sidewalk

Pilot-Credits PC14:Walkable Streets
posted by  Qiongwen Kong  on 

This is in regards to the requirements 6 and 7. 6 - No more than 20% of the street frontage includes garage or service bay openings. Alley access is used instead, if available.

0

Inconsistent Price Square Meters versus Square Feet

Pilot-Credits SSpc83:Offsite Financial Support for Habitat Protection
posted by  Ben Stanley  on 

We're pursuing this pilot credit for an EBOM project and it looks like the stated price for financial support is inconsistent if your reporting site area in square meters ($0.5 /square meter) versu

0