Social equity within the community
NC-v4 INc1:Innovationposted by Miriam Ramirez Baumgarten on
Hi, Our project is pursuing the Pilot credit "Social equity within the community" with Option 1: Complete The SEED Evaluator Parts 1 and 2.
Project located in a building with a very low fresh air rate
Retail-NC-v4 EQp1:Minimum indoor air quality performanceposted by Valentin Grimaud on
What if the project is located inside a 30-year old building with AHU supplying less than 10% fresh air rate? As we have to use the centralized ventilation system and we couldn't make any change t
Chilled water flow and pipe sizes
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Jayakumar Pamuri on
Hi All, I am here to post my query about chilled water system,flow and pipe sizes.
project with courtyard walls...
Pilot-Credits PC14:Walkable Streetsposted by Frank Yao on
We have a small project with a courtyard with an area pretty much doubling the building footprint which has a wall (concrete wall, not a fence) all along the peripheral yard.
SSc2 - Can on-campus uses apply towards "basic services"?
NC-2009 SSc2:Development Density and Community Connectivityposted by Jordan Petersen on
We are currently attempting to achieve SSc2 Development Density + Connectivity on a University Campus for the construction of a number of student housing units.
ESC plan
NC-v4 SSp1:Construction activity pollution preventionposted by Ana Paula Quiros on
Hello, There is a hotel that might look certification and has 2 floors already built, then the construction stopped and they want to add now 3 more floors.
Existing parking lot, new LEED space
CI-2009 SSc3.3:Alternative Transportation—Parking Availabilityposted by Susan Reid on
Our project is a build-out in an existing non-LEED building in a suburban office park - there is a shared parking lot for several buildings and we are not adding any NEW spaces.
Bus Instead of Shuttle
CI-2009 SSc3.1:Credit Alternative Transportation—Public Transportation Accessposted by Rachel Manoguerra on
Our project is looking into using a mass transit center that is less than two miles from the project for this credit.
n/a
NC-v4 EQc5:Thermal comfortposted by Anaïs P on
Hello, I am working on trying to obtain the indoor environmental quality-thermal comfort credit for a new construction. The building contains new open-office workstations.
Requirement 7 - Windows in the Stairs
Pilot-Credits EQpc78:Design for active occupantsposted by Douglas Flandro on
Do the windows in the stairways need to be 8 square feet at each level? I have a 3 story stairwell with a narrow window that runs the length of the stairs. It is 19 feet by 1 foot.