Forum quick links
Water Meter
Homes-v4 WEp1:Water meteringposted by Gregory Minott on
My understanding of this credit, is that at a minimum there needs to be a water meter installed to monitor the entire building. It is not required to provide submetering.
NC Tenant Guideline Requirement
CS-2009 SSc9:Tenant Design and Construction Guidelinesposted by Martha Norbeck on
Tenant Guidelines are a credit under Core and Shell, but are required under MPR if you have a tenant space in a New Construction project.
Option 1: Limited Turf Area
EBOM-v4 SSc5:Site managementposted by Stephanie Donovan on
Hello - the site I'm looking at already has under 25% turf area. In fact it has no turf, only vegetation.
Structure and Enclosure
NC-v4 MRc4:Building product disclosure and optimization - material ingredientsposted by Jon Clifford on
A discussion on the BPDO-EPD forum (http://www.leeduser.com/comment/redirect/66396) has started me thinking about how to treat materials that could fall on a Credit tipping point depending on wheth
VOC Limit for anticorrosive paints
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Kerem Mavioglu on
Is there any other restrictions for anti-corrosive paints other than 250 g/l VOC limit in Leed V4? Is it enough for a paint product to have lower VOC value than 250 g/l to be leed V4 compliant?
Office CS without housekeeping storage room
CS-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Cathy W on
As it is a CS project (office building), the owner is not responsible for hiring housekeeping staff for tenant spaces. There is no housekeeping storage room in the project.
Zone adjust in residential project
CS-2009 EAp2:Minimum Energy Performanceposted by Panupant Phapant on
We have an apartment building project. In 1 dwelling unit has 1 bedroom 1 living unit and restroom. Do I need to separate between bedroom and living quarter ?
EPA registered chemicals and new UL equivalent of CCD 146
EBOM-2009 IEQc3.3:Green Cleaning—Purchase of Sustainable Cleaning Products and Materialsposted by Pablo Fortunato Suarez on
My queries: A. Would procurement of EPA registered chemicals (not paper), as claimed by supplier, comply with LEED requirements for this credit & contribute to getting LEED points? B.
Outdoor water use to water mirrors in roof
CS-v4 WEp1:Outdoor water use reductionposted by Tobias Berge on
Is small water mirrors situated at the roof included in the credit? The architect has planned a few water mirrors close to a sky bar.
Slab on grade and concrete piers
NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roofposted by David Browne on
I have a large building with an arena at the second level. I am retaining the slab on grade on the first level except for some small cuts to run piping.