Store targeting LEED CI certification within a mall
Retail-CI-v2009 EAc1.5:Optimize energy performance - building envelopeposted by Anne-Claire BARBERI on
Hello, We are working on LEED CI certification for a store within a mall. If the store has no external facade, does this credit can be achieved?
Basement That Extends to Plot line
NC-2009 WEc1:Water Efficient Landscapingposted by Omar Elrawy on
Hi, My project has two levels basement that extends to the land's plot line, while the above-grade floors are much smaller areas than the basement area.
energy savings for tenant vs Materials & Resources credits
CS-2009 EAp2:Minimum Energy Performanceposted by Richard Mathews on
We designed the Core & Shell of this building as one project - and subsequently also designed most of the tenant occupancies, so we know that there are savings in the lighting for the various t
EBOM recertification for SSc1 path
EBOM-2009 SSc1:LEED Certified Design and Constructionposted by AtSite Inc on
It is still unclear to me what "ongoing tracking" means to be eligible for SSc1 when pursuing via an EBOM recertification.
FTE of hotel guests
NC-2009 PIf3:Occupant and Usage Dataposted by Rob Hink on
How do I calculate FTE of hotel guests? I know have to do it during non-peak time of year and peak time of year. Also what do I do for visitors and transients?
Zero Lot Line
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Omar Elrawy on
Dear all, I have a project with an underground parking within the whole LEED project boundary, and landscape work above the underground parking, all around the above-grade building. Du
Energy Update ballot
NC-2009 EAp2:Minimum Energy Performanceposted by Kathryn West on
when will the results of the ballot be posted?
lavatory faucet in a dormitory
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Nelina Loiselle on
Hello, I am working on a Co-ed dormitory were all of the bathrooms will be residential with the exception of two single occupancy bathrooms on the ground floor.
EQc3.1 IAQ Construction during construction
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Kimo Steed on
We are building a new building with concrete precast wall and roof panels with a concrete slab-on-grade.
majority residential
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Courtney Royal on
Our project is a multifamily building with several common spaces on the cellar, main level, and top level of the building. However, majority of the building is apartment units.