Schools-NC-v4 WEp2:Indoor water use reductionposted by Charli Holt on
I am working on a project in Hammond, LA for a university. The building is 2,000 sqft and is a "teaching sustainability center". I am unsure on how to calculate the FTE's for WEp2 etc.
Commissioning Manual and Report
NC-2009 EAc3:Enhanced Commissioningposted by Jalal Avades on
Our project commissioning exercise filled more than 30 binders and if we scan them and upload them it will be couple of Giga Bytes of files.
ACEEE list
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Analu Granda on
Hi! I've been looking everywhere for the last list of green cars with a 40 score of ACEEE at greencars.org and it seems that it isn't in the web anymore... Can you please help me???
Gross Square Footage
NC-2009 PIf2:Project Summary Detailsposted by Indochine Engineering VN on
Hi! My project is using double glazing facade, there is inner glass at the floor, then big air gap and the outer glass that is hang by a steel structure.
FIre station modeling
NC-2009 EAp2:Minimum Energy Performanceposted by David Hahn on
I am currently working on a fire station building in NC and I'm using HAP 4.8 to model this building vs. the baseline.
Large footage residence and threshold adjustment
posted by LEED Pro Consultant on
Hello. We are in the very first steps in our first LEED Home.
Regional- Additives Taken into Consideration?
CS-2009 MRc5:Regional Materialsposted by Roberto Meza on
I have a question regarding the Regional Materials Credit: If a product has the following components: - Cement (local product) - Sand (local product) - Additives (imported) Will this product comp
CS MPR2: reclaimed land without development previously
CS-2009 MPR2:Must be a complete, permanent building or spaceposted by Vivien Wong on
Dear Tristan, If a project is located in a reclaimed land which without previous development (i.e.: the project will be the first development in the reclaimed land), can still meet the requirement
IAQ Option #1
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by David Biggs on
For a building pre-occupancy flush-out what are the requirements for substantiating that the 14,000 cfm of OA was actually completed for the entire square footage.
Appealing WEp1
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Anu Sumanth on
We have a small two story core and shell project. The owner provided rough ins for plumbing fixtures to be installed by the tenant.