Forum quick links
Performance Periods in LEED-EBOM: Rules to Follow--Do these apply to EBOM 4.1?
posted by Brian Salazar on
Hi. We’re working on a LEED EBOM 4.1 project, and I’m trying to understand whether the performance period rules are different for LEED 4.1 than for 4.0. We took a first pass through the
Cafeteria with patio seating
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Margaret Montgomery on
In a cafeteria situation where indoor seating bleeds into patio seating with operable windows and person doors between, I assume we still need a walkoff system?
Greenguard Gold in a First Floor of Home environment...
NC-v4.1 EQc2:Low-Emitting Materialsposted by Patty Karapinar on
Hello,
What type space to place it on the ARC platform for a Casino?
posted by LEED Pro Consultant on
hello everyone,
We are currently working on project O+M for existing buildings v4.1 for a casino in Mexico.
Interior Lighting Control
NC-v4.1 EQc6:Interior Lightingposted by Jennifer Atherton on
What is the definition of "occupant spaces" ?
Cooling Water Treatment
posted by Victoria Dubeau on
Is there any guidance or specification around the water treatment of a cooling water system.
NYC Regional Mini-Summit Report
posted by Matthew Boyd on
Hello Sustainability Leaders!
Area behind fiberglass enclosure IF WALLBOARD IS INSTALLED
Homes-v4 MRp2:Durability managementposted by Marijana Misic on
With fiberglass tub surrounds, the flanges are typically attached to the studs, and moisture-resistant wall finish is overlapped above and sealed.
Translucent fixture for strategy D
NC-v4 EQc6:Interior lightingposted by Omar Elrawy on
IF I have a lighting fixture with direct light, however, the fixture's glass is translucent / white glass. i.e.