Forum quick links
Integrative Process-Value Engineering
Pilot-Credits PC60:Integrative Processposted by Susan Coy on
Do you use Value Engineering in documenting this process?
Mix LEED NC and LEED CS within LEED Campus?
posted by Nelina Loiselle on
We have a project that has six buildings on it. The owner wants five of them to be CS, and one of them to be NC. Are we able to mix rating systems within an overall LEED Campus registration?
Using v4 requirements on a v3 project
NC-v4 LTc4:Surrounding density and diverse usesposted by Brightworks Sustainability on
Our project is hoping to use the v4 criteria (diverse uses) to meet the requirements for a v3 project.
margin
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Francesco Passerini on
In DesignBuilder for the daylight simulation you have to impose a value for the parameter "margin", which is defined in the following way: Enter the margin (in m or ft) around the zone boundaries w
Pursuing option 2, path 2
CS-2009 WEc1:Water Efficient Landscapingposted by Andrey Kuznetsov on
Dear colleagues, maybe my question will be stupid, but I hadn't found a strict answer, so I'm a little bit confused. We have a project that has no permanent irrigation system, only a has a hose bi
Final Review Denial with no Preliminary Comments?
posted by Nita Christopher on
We were recently denied a credit in the Final Review Phase on the basis of information that was presented in the Preliminary Review Phase that GBCI had no comments upon.
Achieving credit using TSS concentrations
NC-2009 SSc6.2:Stormwater Design—Quality Controlposted by Manuel Martin Delgado on
Hello, I would like to get confirmation on whether the following approach of demonstrating compliance with LEED requirements could be accepted or not.
Recycled Content Percentages
NC-2009 MRc4:Recycled Contentposted by Jace Christensen on
I am calculating the percentage of materials that contain recycled content. It says MEP type work is not to be included in the calculation.
Visitor Count - Dormitory
NC-2009 MPR5:Must comply with minimum occupancy ratesposted by Todd Bundren on
We received our preliminary design review comments back and were asked to include a daily average visitors number. Our average users value is 3, peak users value is 27, and the FTE value is 3.
Updated SF Pesticide Hazard Screening List
EBOM-2009 IEQc3.6:Green Cleaning—Indoor Integrated Pest Managementposted by Trista Brown on
Heads up that an updated list came out in September 2013 and can be accessed here - www.sfenvironment.org/sites/default/files/fliers/files/sfe_th_pesticides_reviewed_091313.pdf We'll be updating