Construction Waste Management - use of materials for shoring, etc.

NC-v4.1 MRp2:Construction and Demolition Waste Management
posted by  Erik Heuler  on 

If a contractor uses demolished lumber as temporary shoring on a project does that count as material reuse or diversion from the landfill?

0

Surrounding Density - Future Development

NC-v4 LTc4:Surrounding density and diverse uses
posted by  Laura Smith  on 

We are working on a project that does not yet meet the density requirement but is expected to see substantial development in the near future.

3
Sustainability specialist, LEED AP
Volvo cars
LEEDuser Basic Member
0 thumbs up
Wed Feb 4, 2026, 8:19 am

Energy model pump baseline for ultra tall buildings

CI-v4 EAp2:Minimum energy performance
posted by  Samantha Allen  on 

Has anyone run up against issues in energy modelling for spaces in ultra tall buildings? LEED baseline in IES 6x lower than the actual for the building.

0

MERV 14 and WELL

Pilot-Credits INpc155:Design for Indoor Air Quality and Infection Control
posted by  Chris Osterhoudt  on 

For projects pursuing WELL certification in tandem with LEED, MERV filtration requirements are already being met, and ventilation strategies are outlines in the Sequence of Operations as part of th

1
Tue Feb 3, 2026, 4:28 pm

Strategy for Project surrounded by Active Non-LEED Construction & Dirt Roads

NC-v4 SSp1:Construction activity pollution prevention
posted by  A&L SUSTENTABILIDADE   on 

I am looking for advice on best strategy to comply with this prerequisite, since it's a unique site condition.

0

Thermally Fused Laminate Panels

NC-v4.1 EQc2:Low-Emitting Materials
posted by  Allen Cornett  on 

With the addition of a fourth bullet under Formaldehyde Emissions: The VOC emissions evaluation documentation for any finish or treatment applied off-site (if applicable), does the melamine on Ther

0

Legal Wood - Pilot Credit LEEDv4

NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materials
posted by  Sophie Kerr  on 

If I have SFI products that make up 100% of my wood products, 25+% of my total materials, and have I completed the survey, have I met the pilot credit?

8
Sat Jan 31, 2026, 12:37 am
1
Default Avatar
Greenwood Consulting Group
LEEDuser Premium Member
0 thumbs up
Thu Jan 29, 2026, 11:57 pm

Recommendations for developing a standard green lease

Pilot-Credits EApc159:Green Leases ACP
posted by  Sofia Z  on 

Hello, our projects aim to develop a standard green lease to comply with Path 1 of the ACP.

2