Forum quick links
Climate zone in Copenhagen, Denmark
NC-2009 EAc1:Optimize Energy Performanceposted by Lise Dannesboe on
Our office building is placed in Copenhagen, Denmark. Our question is which climate zone to use?
pipe insulation
NC-2009 EAp2:Minimum Energy Performanceposted by Francesco Passerini on
If I model a hydronic HVAC plant shall I consider in the proposed model the heat losses through the pipes? And in the baseline model?
No contaminant area-related-sources
NC-2009 IEQp1:Minimum IAQ Performanceposted by Ian McCall on
Dear LEED Users, I have a question regarding the prerequisite 1 of IEQ Section: Minimum Indoor Air Quality Pollution. According to the Ventilation Rate Procedure of ASHRAE Standard 62.1-2007, the
Eap2. Fan Power Limitation Pressure Drop Adjustments.
NC-2009 EAp2:Minimum Energy Performanceposted by Carlos Vazquez on
We are in process of submitting for certification a health care out patient clinic. The proposed buiding has air handling units are chilled water cooled with many devices.
CIR and Documentation
posted by Erika Duran on
Does anyone know if you have submitted a CIR and gotten positive feedback on your strategy, do you have to upload the response with your credit documentation or is it linked already to your projec
Help! Where can I find ArcEditor 9.3 for the Connections Tool?
posted by Eric Orozco on
Greetings! According to the Connections Tool resource page on LEED-Online: "The user must have ArcEditor 9.3 or ArcInfo 9.3.
Credit requirement clarification.
Healthcare-v2009 SSc9.1:Connection to the natural world - places of respiteposted by BABAR MEHMOOD on
We are working on a healthcare out patient clinic. The credit says that we will take the net usable area excluding the building equipement, vertical circulation and structure.
Does CARB certification meet the Requirements?
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Erika Duran on
I just had a manufacturer submit a CARB Phase 2 Certification for this credit for Par Ky flooring.
Project Boundary for LEED CI project
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Jerry Reeves on
My project is a renovation of one floor of a 4 story office building. The entire floor is leased by one tenant. No initial fit-out is in the scope of work. We are targeting LEED CI certification.
New vs. Existing
CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliancesposted by Lara Schneider on
Where in the 2009 CI LEED reference guide does it state that only NEW Energy Star appliances are to be included in the calculations?