Forum quick links
Fair Housing Act
Pilot-Credits PC34:Design for Adaptabilityposted by Kenneth O'Brien on
Why don't you just list the requirements for Fair Housing? The vague language of the list in the requirements is confusing.
Chain of Custody (COC) - Direct Delivery to Site
CI-2009 MRc7:Certified Woodposted by Christie Rimes on
We are procuring noggings that are FSC certified. The vendor doesn't have chain of custody certification.
Exterior No Smoking- Specific Signage Text
Schools-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Kelly Martinez on
We documented a "no smoking" sign (text and image) on the exterior wall of the building vestibule.
Narrative for Option 2 Contractor confimration
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Saud Abdul Rasheed on
Hi all, We are not going to provide photos for this credit but we have an IAQ plan developed and the contractor has been following it according to the credit requirement.
Footfall Vibration on HC
Healthcare-v2009 IEQc2:Acoustic environmentposted by Saymon Grauppe on
Hello. There's another doubt now about Footfall Vibration . It will be used a rubberized coating that reduces this effect and also has sound absorptive properties.
prescriptive efficiency requirements ABCPG section 2.9
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Rahul Yadav on
Hi We are doing a LEED CI project in India. The scope of the project includes only AHU , ducting and HRW from the HVAC side.
Maintenance Costs Savings
EBOM-2009 EAp1:Energy Efficiency Best Management Practicesposted by Charalampos Giannikopoulos on
Further to a project review it was commented by the reviewer that” the list of potential low-cost/no-cost energy efficiency and conservation upgrades and programmatic changes did not include the ma
VOC Limit - Thread Cutting Oils
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Jason Biondi on
What is VOC limit for "Thread Cutting Oils" as per SCAQMD Standards to comply with LEED requirements ?
Cycle lane between project and Bicycle Network
NC-v4 LTc6:Bicycle facilitiesposted by Alicia Costas Freire on
Hello, I have a quick question and I would very much appreciate if someone could assist. I understand from the LEED guidance that there is no requirement for provision of a dedicated cycle lane be
Building area to site area ratio
CS-2009 PIf2:Project Summary Detailsposted by Giuseppina Amorusi on
Hi, I am doing an office tower (19 stories above grade).