pursuing thermal confort in a museum/gallery
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Angel Vega on
Our team is pursuing this credit for a museum/art galleries building. I´ve been checking the IAQ matrix and if I am strict, we should forget this credit.
ADA requirements for charging stations
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Deborah Lucking on
Just a heads up that some states (CA, I believe) have ADA requirements for the location of electric car charging stations, and related signage.
Dark rooms / film development rooms / etc.
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Heather Holdridge on
I'm working on a higher ed art building with dark rooms, photo labs, and film development rooms that are projected to be occupied by one person at a time.
MANDATORY REQUIREMENTS AHSRAE 90.1
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Jorge Torres-Coto on
Does anyone know if isolation valves on a multiple chiller plant are required by ASHRAE, or they simply best practice? I have looked into this in ASHRAE documents, but have not found anything yet.
MANDATORY REQUIREMENTS AHSRAE 90.1
NC-2009 EAp2:Minimum Energy Performanceposted by Jorge Torres-Coto on
Does anyone know if isolation valves on a multiple chiller plant are required by ASHRAE, or they simply best practice? I have looked into this in ASHRAE documents, but have not found anything yet.
Carbon Dioxide Monitors
EBOM-v4 EQc2:Enhanced indoor air quality strategiesposted by sebastian castañeda on
I currently have installed co2 sensors in densely occupied rooms located to the specifications mentioned in the OM LEED V4 Ref Guide.
EPD Option 2 - Compliance
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Alexa Stone on
For Option 2 - How do you determine credit compliance with an industry-wide EPD?
Can't find pipe insulation that meets LEED V4 criteria
posted by Phil Vanderloo on
Can someone guide me in to some pipe insulation for 1/2" pex piping that meets the requirements of LEED V4 Homes. Needs to be 1/2" wall thickness, minimum R-4 Everything I can get locally is R3.5,
R-4 pipe insulation
Homes-v2008 EAc7:Water heatingposted by Phil Vanderloo on
Does anyone have a recommendation for pipe insulation that meets LEED V4 criteria? Min R-4, 1/2" wall thickness Thank You
Option 1 or Option 2
CS-2009 EAc6:Green Powerposted by Martin Meehan on
Hello all, I am working on a Core and Shell project that is targeting Green Power. While we have an energy model for the project, can you confirm if the project MUST use the Option 1?