Innovative Approaches to Construction Waste

SC Leaders
posted by  Steven Burke  on 

To piggyback off Nathan's introduction where he mentions construction waste management, who is doing anything innovative or different in managing construction waste?  Construction waste has no

10
Director of FM Integration and Sustainability
Shawmut Design and Construction
LEEDuser Basic Member
21 thumbs up
Tue Mar 6, 2018, 1:26 pm

Interior Lighting Controls - Daylighting Controls

CI-v4 EAc2:Optimize energy performance
posted by  Michael Archer  on 

The credit states the following: Install daylight-responsive controls in all regularly occupied daylit spaces within 15 feet (4.5 meters) of windows and under skylights for at least 25% of

1
Wed Mar 7, 2018, 11:08 pm

Demolition includes Mechanical and Electrical equipment

NC-v4 MRc5:Construction and demolition waste management
posted by  Jeff Ross-Bain, PE, LEED Fellow, WELL AP  on 

Assume a building to be demolished has large HVAC equipment and electrical gear, etc., and is not being reused but discarded.

1
Tue Mar 6, 2018, 3:16 pm

ventilation chimneys for buffer space

NC-v4 EQp1:Minimum indoor air quality performance
posted by  Francesco Passerini  on 

The corridors are separated from the staircase by two doors in order to create a space (buffer space) whose walls and doors are fire-resistant.

3
Mon Mar 5, 2018, 8:38 pm

Calculating F.T.E. for a police substation

NC-2009 PIf3:Occupant and Usage Data
posted by  Joe Malone  on 

We are working on a police substation that houses two precincts with three shifts per precinct.

1
Mon Mar 5, 2018, 10:34 pm

Permanent entrywway systems - rollout mats?

NC-v4 EQc1:Enhanced indoor air quality strategies
posted by  Keith Robertson  on 

The reference guide includes rollout mats in the list of "acceptable permanent entryway systems." LEED 2009 allowed rollout mats to be used as part of the 10' but treated it as non-permanent.

3
Mon Mar 5, 2018, 6:15 pm
1
Mon Mar 5, 2018, 11:02 pm

Semi-Heated Space, fan volume & fan power must be modeled identically in baseline and proposed.

NC-2009 EAp2:Minimum Energy Performance
posted by  Dave Hubka  on 

Hello,

We received a review comment that states "the fan volume and fan power should be modeled identically in the proposed and baseline for semi-heated spaces".

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Mon Mar 5, 2018, 4:23 pm

School as a Teaching Tool French Learning Lab??

Schools-NC-v4 INc1:Innovation
posted by  Leanne Conrad  on 

I am working with a Francophone school in Canada who wish to pursue the School as a Teaching Tool innovation credit.