Forum » CS-2009 EAp2
Topic

Additional lighting power density in a retail store

CS-2009 EAp2: Minimum Energy Performance
posted by Felipe Duran on Jul 1, 2015, 8:30 pm

Dear All,

We are working on a shopping mall project which is pursuing LEED for C&S certification. According to table 9.6.1, maximum lighting power...

Last reply: Felipe Duran, Jul 2, 2015, 5:05 pm

Scope in a C&S shopping mall

CS-2009 EAp2: Minimum Energy Performance
posted by Alan Viale on Jun 19, 2015, 12:47 pm

We are working on a new shopping mall. as usually in my country, a anchor store (tenant deparment store) was first developed and constructed, and now is operating. The other common, concourse and...

Last reply: Marcus Sheffer, Jun 19, 2015, 12:58 pm

Lighting Energy Efficiency as a Lease requirement

CS-2009 EAp2: Minimum Energy Performance
posted by Scott McMillan on Apr 13, 2015, 7:11 pm

We are compiling the LEED submission for an office tower that may have multiple tenants on each floor.
Is it possible to claim tenant lighting energy efficiency savings through the...

Last reply: Charalampos Giannikopoulos, Jun 17, 2015, 4:01 pm

Lighting control in Tenant space

CS-2009 EAp2: Minimum Energy Performance
posted by Indochine Engineering VN on Jun 16, 2015, 1:03 am

Hi, I have an open office, restaurant, apartment for rent in the mixed use building project. Im confused with lighting control mandatory section 9.4 ASHRAE. Item 9.4.1.1 says automatic control...

Last reply: Marcus Sheffer, Jun 16, 2015, 9:45 am

G3.1.2.8 Design airflow rates

CS-2009 EAp2: Minimum Energy Performance
posted by Agnieszka Rylska on May 6, 2015, 5:18 am

I have a question regarding section G3.1.2.8 of Appendix G. This section says that "design supply airflow rates for the baseline building design shall be based on a supply-air-to-room-air...

Last reply: Marcus Sheffer, Jun 11, 2015, 9:37 am

Modeling of CHP

CS-2009 EAp2: Minimum Energy Performance
posted by MARCIO OROFINO on Mar 2, 2015, 2:55 pm

I am working in a project that had a previous consultant and we do not agree with the way the...

Last reply: MARCIO OROFINO, May 18, 2015, 1:57 pm

Warehouse Semiheated or Heated?

CS-2009 EAp2: Minimum Energy Performance
posted by Tony Schafer on May 8, 2015, 11:01 am

I am running into a conundrum for a CS warehouse that will have no HVAC systems installed upon completion of the CS project. The only energy savings to document are for the envelope and lights....

Last reply: Marcus Sheffer, May 11, 2015, 10:07 am

Duct / Piping / Equipment insulation

CS-2009 EAp2: Minimum Energy Performance
posted by Dave Hubka on Apr 13, 2015, 3:40 pm

Does LEED allow the modeler to claim savings for increased insulation on either the ductwork, piping, or equipment itself?

Last reply: Marcus Sheffer, Apr 13, 2015, 5:16 pm

Process Load of a factory applying LEED CS

CS-2009 EAp2: Minimum Energy Performance
posted by Jatuwat Varodompun on Mar 31, 2015, 10:51 am

I have a factory to be built for rent. Thus, this project goes for CS since we only build the shell. However, since we don't know the detail of a machine to be used (depend on the future tenant/...

Last reply: Marcus Sheffer, Mar 31, 2015, 11:32 am

HVAC System 8 Baseline

CS-2009 EAp2: Minimum Energy Performance
posted by CINDY CHAI on Mar 18, 2015, 10:53 am

Hi all,

Currently I have a project in Malaysia that is going for LEED Core and Shell (2009), the project consists of multiple buildings but will be certified under one certificate. The...

Last reply: Marcus Sheffer, Mar 25, 2015, 8:39 pm