Additional lighting power density in a retail storeCS-2009 EAp2: Minimum Energy Performanceposted by Felipe Duran on Jul 1, 2015, 8:30 pm
Dear All, We are working on a shopping mall project which is pursuing LEED for C&S certification. According to table 9.6.1, maximum lighting power... Last reply: Felipe Duran, Jul 2, 2015, 5:05 pm |
|
Scope in a C&S shopping mallCS-2009 EAp2: Minimum Energy Performanceposted by Alan Viale on Jun 19, 2015, 12:47 pm
We are working on a new shopping mall. as usually in my country, a anchor store (tenant deparment store) was first developed and constructed, and now is operating. The other common, concourse and... Last reply: Marcus Sheffer, Jun 19, 2015, 12:58 pm |
|
Lighting Energy Efficiency as a Lease requirementCS-2009 EAp2: Minimum Energy Performanceposted by Scott McMillan on Apr 13, 2015, 7:11 pm
We are compiling the LEED submission for an office tower that may have multiple tenants on each floor. Last reply: Charalampos Giannikopoulos, Jun 17, 2015, 4:01 pm |
|
Lighting control in Tenant spaceCS-2009 EAp2: Minimum Energy Performanceposted by Indochine Engineering VN on Jun 16, 2015, 1:03 am
Hi, I have an open office, restaurant, apartment for rent in the mixed use building project. Im confused with lighting control mandatory section 9.4 ASHRAE. Item 9.4.1.1 says automatic control... Last reply: Marcus Sheffer, Jun 16, 2015, 9:45 am |
|
G3.1.2.8 Design airflow ratesCS-2009 EAp2: Minimum Energy Performanceposted by Agnieszka Rylska on May 6, 2015, 5:18 am
I have a question regarding section G3.1.2.8 of Appendix G. This section says that "design supply airflow rates for the baseline building design shall be based on a supply-air-to-room-air... Last reply: Marcus Sheffer, Jun 11, 2015, 9:37 am |
|
Modeling of CHPCS-2009 EAp2: Minimum Energy Performanceposted by MARCIO OROFINO on Mar 2, 2015, 2:55 pm
I am working in a project that had a previous consultant and we do not agree with the way the... Last reply: MARCIO OROFINO, May 18, 2015, 1:57 pm |
|
Warehouse Semiheated or Heated?CS-2009 EAp2: Minimum Energy Performanceposted by Tony Schafer on May 8, 2015, 11:01 am
I am running into a conundrum for a CS warehouse that will have no HVAC systems installed upon completion of the CS project. The only energy savings to document are for the envelope and lights.... Last reply: Marcus Sheffer, May 11, 2015, 10:07 am |
|
Duct / Piping / Equipment insulationCS-2009 EAp2: Minimum Energy Performanceposted by Dave Hubka on Apr 13, 2015, 3:40 pm
Does LEED allow the modeler to claim savings for increased insulation on either the ductwork, piping, or equipment itself? Last reply: Marcus Sheffer, Apr 13, 2015, 5:16 pm |
|
Process Load of a factory applying LEED CSCS-2009 EAp2: Minimum Energy Performanceposted by Jatuwat Varodompun on Mar 31, 2015, 10:51 am
I have a factory to be built for rent. Thus, this project goes for CS since we only build the shell. However, since we don't know the detail of a machine to be used (depend on the future tenant/... Last reply: Marcus Sheffer, Mar 31, 2015, 11:32 am |
|
HVAC System 8 BaselineCS-2009 EAp2: Minimum Energy Performanceposted by CINDY CHAI on Mar 18, 2015, 10:53 am
Hi all, Currently I have a project in Malaysia that is going for LEED Core and Shell (2009), the project consists of multiple buildings but will be certified under one certificate. The... Last reply: Marcus Sheffer, Mar 25, 2015, 8:39 pm |