Forum » CS-2009 SSp1
Topic

Sprayed concrete as a temporary stabilization measure

CS-2009 SSp1: Construction Activity Pollution Prevention
posted by Michael E. Edmonds-Bauer on Dec 17, 2012, 11:05 am

Our project has around 10 levels of undergrouns parking. A huge ramp for earth-movement vehicles is being created as construction evolves.

The slopes at the sides of the ramp go for more...

Last reply: Mauricio Ramirez, Mar 6, 2019, 8:32 pm

Guidelines/Sample of a good ESC plan proposal

CS-2009 SSp1: Construction Activity Pollution Prevention
posted by Ann E on Jul 10, 2018, 11:06 am

Hi,
Can anyone give me samples or links of complete...

Last reply: David Eldridge, Jul 11, 2018, 4:57 pm

Final stabilization for zero-lot line projects

CS-2009 SSp1: Construction Activity Pollution Prevention
posted by Gabriela Hernández Castillo on Dec 26, 2010, 8:32 pm

For projects that use all site for construction, how does the...

Last reply: Ward Miller, Feb 12, 2018, 4:37 am

2012 EPA CGP comply with this prerequisite?

CS-2009 SSp1: Construction Activity Pollution Prevention
posted by Pamela Svetllana Santos Souza on Jul 14, 2017, 7:13 am

I'm modelling for LEED C&S 2009 and the project has 26 floor type of mixed-use offices. Does the 2012 EPA...

Last reply: Tristan Roberts, Aug 26, 2017, 6:10 pm

v6 Forms with Different Compliance Paths

CS-2009 SSp1: Construction Activity Pollution Prevention
posted by Michelle Rosenberger on Dec 12, 2016, 5:02 pm

This prerequisite has always had 3 compliance paths - photos, inspection reports or a maintenance narrative. The v6 form for this prerequisite apparently only has two compliance paths - photos or...

Last reply: Michelle Rosenberger, Dec 21, 2016, 2:35 pm

Precertification- LEED 2009 Core & Shell

CS-2009 SSp1: Construction Activity Pollution Prevention
posted by Michael Heacock on Nov 1, 2016, 8:36 pm

We are working on submitting a precertification. I'd thought the credits team was working on were design phase. If I submit the precertification, can I quickly turn in for design phase. I've read...

In which construction phase can I certify my building?

CS-2009 SSp1: Construction Activity Pollution Prevention
posted by Hazem Yusuf on May 3, 2014, 12:10 pm

Construction phase of an office building is consisting of multi stages. Those stages are including but not limited to; excavation stage, concrete skeleton stage, block work and plastering stage,...

Last reply: Tristan Roberts, Nov 27, 2015, 5:06 pm

Fire during construction

CS-2009 SSp1: Construction Activity Pollution Prevention
posted by Constanza Cattan on Dec 23, 2014, 9:03 am

Dear all,
I would like to know if LEED Certification is affected (in any way) if a fire occurs by accident during construction.
Thank you.

Last reply: Tristan Roberts, Dec 23, 2014, 12:01 pm

SSp1 description for CS precertification

CS-2009 SSp1: Construction Activity Pollution Prevention
posted by Nándor Kovács on Aug 18, 2014, 7:55 am

We are working on a project precertification (v2009) and I was suprised that the precertification credit form requires a description of measures that will be implemented at the project site....

Last reply: Michael DeVuono, Aug 18, 2014, 7:58 am

NYC project

CS-2009 SSp1: Construction Activity Pollution Prevention
posted by Megan Bove on May 27, 2014, 11:02 am

Hi. I have a project in the city where subway grates are found right outside the project fence as well as always a storm drain that is on a very busy street. Are these required to be covered and/...

Last reply: Michael DeVuono, May 27, 2014, 11:42 am