Forum quick links
1 year and 2 year 24 hr design storm
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by sona prajapati on
In case 1, we are required to perform a site run off calculation for 1 yr-24 hr design storm and 2 yr-24 hr design storm for both pre- and post- development period.
Indoor pool daylighting measurement
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Gary Greenshields on
We have a Wellness Center project with an indoor pool area of approximately 6,000 SF and a pool surface area of about 4,000 sf within that space.
LEED NC 2009 EAc5 Measurement and Verification
NC-2009 EAc5:Measurement and Verificationposted by Zeb Foss on
I am currently training and researching in order to become involved in the M&V process for various new construction buildings within the near future.
WEp1 Exemption?
CI-2009 WEp1:Water Use Reduction—20% Reductionposted by Cathal Heneghan on
Hi I am working on a CI 2009 project in Dublin, Ireland. The project is an office TI involving the bottom 3 floors of a 5 floor building.
rainwater calculation
NC-2009 WEc1:Water Efficient Landscapingposted by ebru unver on
lansdcape water calculation montly/daily and rainwater Hello, we are collecting rainwater, so to use at the landscape irrigation and to have addition 2 point.
Psychrometric Chart and 6.1.1 Documentation
NC-2009 IEQc7.1:Thermal Comfort—Designposted by Sangmin An on
I am in the process of preparing the documentation for this credit but have a few a few questions regarding ASHRAE 6.1.1 Documentation and associated calculations.
Modeling a humidifier in the baseline case
NC-2009 EAp2:Minimum Energy Performanceposted by Gustav Alfaro on
Hi, I am working on a data center project under NC 2009.
Private Bus Service
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Daniel R Gutierrez on
Hi all, We are working on a new factory building in an industrial complex. The complex, located in a rural area is at least six miles away from the city boundary.
Rotating Lab Equipment and How to Include It?
NC-2009 EAc1:Optimize Energy Performanceposted by Brett Beckemeyer on
I am currently working on a lab facility which has five labs of varying types.
Glazing ratio
NC-2009 EAp2:Minimum Energy Performanceposted by CT G on
We are working with a building that has 9 floors, the first 6 floors are for parking, unconditioned naturally ventilated with no glass on the envelope, and the last 3 are conditioned office spaces