Interview Room with 2 seats

NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfort
posted by  Maher Hemod  on 

what dose consider an interview room with 2 seats in a hospital project, is it individual occupant space or shared multi occupant ? Thanks in advance.

2
Sustainability Specialist
Gensler
LEEDuser Basic Member
66 thumbs up
Thu Mar 3, 2016, 5:10 pm

Private bus line for public use?

NC-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  Michael Wahjudi  on 

Hi all, I have received reply from LEED reviewer stating that "campus or private bus line that falls within onequarter mile of the project site must provide transportation service to the public in

2
Senior Principal | Director of Sustainability Integration
SmithGroup
LEEDuser Expert
43 thumbs up
Thu Mar 3, 2016, 2:14 am

indoor irrigation

NC-v4 WEc1:Outdoor water use reduction
posted by  Francesco Passerini  on 

Is indoor irrigation not considered in this credit? If it isn't, could I consider it in the section "Innovation", since, in the project I'm considering, collected rainwater is used?

3
Founder & Community Director
Metricorps
LEEDuser Expert
7780 thumbs up
Thu Mar 3, 2016, 1:27 am

LEED rating system change from CS to NC?

LEED Rating System Selection
posted by  Jeroen Sap  on 

I am working on a Core&Shell office building project. The owner has not yet found a tenant so we are preparing design documentation for LEED CS.

3
M.Eng Facility Management LEED AP BD+C | LEED GCP
Alpha Immobilien Consulting GmbH
LEEDuser Basic Member
19 thumbs up
Wed Mar 2, 2016, 4:05 pm

Recert vs. new Cert

LEED Recertification: When and How
posted by  Jessica Hawley  on 

Reading through this forum I still don't think I see a clear consensus on recert vs. new cert. I have a client who was originally certified in 2011 EBOM and they are up for recertification.

5
Sustainability Consultant
LEEDuser Basic Member
43 thumbs up
Tue Mar 1, 2016, 5:41 pm

Hydrogen Production

NC-2009 EAc2:On-Site Renewable Energy
posted by  Kristopher Lashley  on 

Hi, We are looking to install an on-site hydrogen production station that will produce hydrogen that is then sent to hydrogen charging stations around the project to refuel and run a fleet of hdrog

6
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Mar 1, 2016, 4:24 pm

Walking distance from the barracks

NC-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  Jose Dehitta  on 

Our project is a cafeteria which is inside the military base. All the soldiers walks from their barracks to eat or pick up food at the cafeteria. Can we use Option #2 to get 6 points?

3
Mon Feb 29, 2016, 9:48 pm

How to count Individual Worksations

NC-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  SAMY Chamy  on 

Dears:- we have open office with 20 Desk.in every desk three occupants are working.That three occupants do the same operations in 15 desks in remaining desks they do different activities How can

4
Enginneer
T&T Green
LEEDuser Basic Member
9 thumbs up
Mon Feb 29, 2016, 5:21 am

LEED V4 - TENANT SPACE ENERGY MODELING

CI-2009 EAp2:Minimum Energy Performance
posted by  Paula Hernandez  on 

Hi, Regarding the Energy Performance Calgulator that should be used instead of Table 1.4, my questions are: 1.

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Sun Feb 28, 2016, 3:53 pm

Energy modeling for LEED project (v3) requirement or not

LEED Rating System Selection
posted by  al-emran hossain  on 

We are going to start LEED project (Gold, points 66) in RMG factory at Bangladesh , if we will not consider in energy modeling for v3, that will accept or not , and required then which energy model

2
Energy Efficiency Ninja
Grumman/Butkus Associates
LEEDuser Premium Member
64 thumbs up
Sun Feb 28, 2016, 5:28 am