Forum quick links
Project Sites within a LEED ND Boundary
posted by Philippa Cameron on
There are several sites located within our LEED ND boundary which are at an early project stage, all are large expansions of existing buildings and will still be under design at the time of submiss
Credit Complance/Justification in Spanish
posted by Peter Gibney on
For justifiying compliance with LEED credits for a Project in Spain, can supporting documentation, management plans, etc.
OPR for LEED ND
posted by Philippa Cameron on
Looking through the requirements of LEED ND v4 I can only find reference to the OPR in one location - embedded within Appendix 4 as a requirement for GIB prerequisite Minimum Building Energy Perfor
Existing Building Demolition
posted by Andrew McLaughlin on
We are working on a proposed new Police Headquarters on the same site as the existing Police Building.
Project on Hold
posted by Nereyda Rodriguez on
Our project has been put on hold indefinitely by the Owner. There is a chance that it may come back in a year or two. The project is registered under NC v2009.
LEED v4-Why did you vote yes or no?
posted by Elizabeth Ann Satterfield on
I am doing research on the voting of LEED v4. I know that overall, 86% of USGBC members voted yes. My question is, why did they decide to vote yes? And if you voted no, why?
AHRAE90.1- LIGHTING POWER DENSITY
posted by Ghaleb El Mheirat on
We are curreinlty designing a building targeeting to be LEED certified under version 3.0, As per ASHRAE 90.1:2007 requirements for LPD is mandatory, in which luminare wattage is defined as follow:
Leeds case study
posted by Rudrabir Ghanti on
Dear All, I am currently studying Green buildings as a part of my curriculum at premier engg institute ,IIT-Delhi in india where I have been given an assignment to do an analysis of leeds certfica
Environmental Product Declaration cost markup
posted by Helene Lefkowitz on
I am working on a v4 project and am trying to compare the price of materials with environmental product declarations (EPDs) vs. materials without EPDs.
MR - Ongoing Purchasing and Waste Policy - Food waste (compost)
posted by Julien Lafond on
The summary of changes document linked above notes that this MR - Ongoing Purchasing and Waste Policy prerequisite now requires the tracking of food waste/compost, however this isn't noted in the o