Forum quick links
Tenant Agreement
CS-v4 SSc7:Tenant design and construction guidelinesposted by Robyn Dowsey on
Has anyone ever used the Tenant agreement credit/Core And Shell as a BD&C ID credit -Do you have a good template for sample agreements that have worked in the past.
Leed and well
NC-v4.1 EQc9:Acoustic Performanceposted by miles woolley on
We have an office project that looks at achieving both Leed and Well guidance for acoustics. Does anyone have similar experience? And if so which was the overriding criteria?
Number of steps per hour
Healthcare-v2009 EAp2:Minimum energy performanceposted by Davide Liviero on
Hello everyone,
Minimum Number of Kitchen Equipment
Hospitality-NC-v4 WEc2:Indoor water use reductionposted by Ricardo Sá on
Dear All,
Radon resistant construction for first 4 stories above grade.
NC-v4 EQp1:Minimum indoor air quality performanceposted by Sue Bryant on
-
Requirement: Construct any dwelling unit on levels one through four above grade with radon-resistant construction techniques.
Non-electric and electric energy use for the Renewable Energy credit version 4.1
CI-v4.1 EAc4:Renewable Energyposted by Ana Maria Escobar Cardenas on
Hello!
New LEED project inside an already certified LEED Project
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Husam Haron on
An office building was constructed and awarded LEED Silver. Now, a new building is being planned to be constructed inside the LEED project boundary of the the already certified LEED project.
Is a new v4 project allowed within an existing earlier LEED version project boundary?
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Neumann Monson on
Our client has taken ownership of a property that was LEED certified many years ago under an older version of LEED, maybe NCv2.1. They would like to build a new LEED certified structure on so
On-site EV required if only off-site parking provided?
NC-v4.1 LTc8:Electric Vehiclesposted by Rebecca Aarons-Sydnor on
The first line of the credit states the criteria as "Provide charging infrastructure for electric vehicles for on-site parking." However, under Option 1, it refers to "all parking spaces used by pr