Frit: Views versus Bird collision deterrence
Pilot-Credits SSpc55:Bird collision deterrenceposted by Kath Williams on
Following design decisions, our team discovered the frit pattern chosen to deter bird collision ultimately interfered with obtaining Views credit.
Monitoring requirement for CAV/VAV system or fan?
NC-v4 EQp1:Minimum indoor air quality performanceposted by Camilo Velez on
Good afternoon all,
Exemplary performance threshold under v4.1?
NC-v4.1 SSc4:Rainwater Managementposted by Casey Cullen-Woods on
Is anyone able to locate if there is a revised threshold for exemplary performance under v4.1 of this credit? My particular project is a non zero lot line
Rainwater Management- Exemplary Performance
NC-v4 SSc4:Rainwater managementposted by LUCY WILLIAMS on
Per page 194 of the v4 BD+C Reference Guide, the Exemplary Performance section indicates "Manage 100% of rainwater that falls within the project boundary". This is a fairly vague stateme
Tool for LCA
NC-v4.1 MRc1:Building Life-Cycle Impact Reductionposted by Martin Maribo on
Can the Danish tool, LCAbyg, for MR Credit: Building Life-Cycle Impact Reduction be used for a project in Denmark?
Does the Core and Shell project also have to meet the Exhaust Rate for the Kitchen?
CS-v4 EQp1:Minimum indoor air quality performanceposted by Eric Dyer on
Hello, I am working on a logistics warehouse project in Korea. The Rating System is v4 CS and I have a question in progress.
Zero lot line Definition
NC-v4 SSp1:Construction activity pollution preventionposted by Alex Edwards on
Hi All!
To use Energy star portfolio manager
Data-Centers-EBOM-v4 EAp2:Minimum energy performanceposted by Milan Kumawat on
We are trying to fill the energy star for data center. If we create a single meter for whole building electricity consumption then our score is not reflecting on energy star portal.
Smoking Area at level 2
NC-v4 EQp2:Environmental tobacco smoke controlposted by Wah Wah on