Forum quick links
Glare control devices on interior glazing
NC-v4 EQc7:Daylightposted by Elise Woestyn on
Are glare control devices required only on exterior glazing?
Proposed HVAC system modeling for shell space
CS-v4 EAp2:Minimum energy performanceposted by Eric Dixon on
My question is regarding how the proposed hvac system should be modeled when the C&S design includes a DOAS w/a DX CC and gas HC which is capped at the shafts, therefore there are no ductw
Plan de Contrôle d'Erosion & Sedimentation / Storm Water Prevention Plan
NC-v4 SSp1:Construction activity pollution preventionposted by saif eddine majdaoui on
Does the monitoring of SWPP and PCES have to be carried out every week on LEED certification projects even if in the absence of rainy / weather events (No precipitation / no rain)
Bicycle short term storage - on public footpath
CI-v4.1 LTc4:Bicycle Facilitiesposted by Aparna Pradeep Kumar on
The project provides enough long term secured bicycle storage spaces in the basement.
District energy
NC-2009 EAc6:Green powerposted by Erin Holdenried on
For projects with district energy, such as chilled water and steam, would this energy need to be included in the electricity usage of the project? Such as if the chilled water is pr
DESIGN AND CONSTRUCTION PRELIMINARY REVIEW
CI-v4 EAc2:Optimize energy performanceposted by Zixuan Yuan on
Excuse me, in the supply airflow rate part, it is required that the airflow should be approximately 1 cfm/square feet for the office buildings.
What are Division 1 general requirements of the project specifications
NC-v4.1 MRc3:Sourcing of Raw Materialsposted by Ayman Raouf on
Can someone explain to me what are Division 1 general requirements of the project specifications?
Here are some extracts I can read:
electric vehicles and reduced parking footprint?
NC-v4.1 LTc8:Electric Vehiclesposted by Craig Flandermeyer on
Is there a way in v4.1 to use these two credits in tandem? V4 has some guidance that increases percentages if both are used. Curious if anyone has attempted both.
Bird Collision Deterrence – Performance Monitoring Plan
NC-v4 INc1:Innovationposted by Verde Design on
I am currently developing a performance monitoring plan for the Bird Collision Deterrence Pilot Credit and have a couple of questions: