Forum quick links
Smoking area on rooftop
NC-v4 EQp2:Environmental tobacco smoke controlposted by Hunyum Murya on
If the project has a building that has a rooftop lounge, allowing smoking is that allowed within the credit limits?
Preferred Parking Reductions and Designations
CS-v4 LTc7:Reduced parking footprintposted by Conor Merrigan on
I have two questions for a project we're currently working on:
Designing with Nature - Green walls indoor
Pilot-Credits EQpc123:Designing with Nature, Biophilic Design for the Indoor Environmentposted by ANTONIO CERECEDA on
Currently we are working in a LEED project which we are pursuing this pilot credit of Designing with Nature, and we are wondering if green walls indoor could be one of the five strategies?
Vertical illuminance perpendicular to Lighting Boundary
NC-v4 SSc6:Light pollution reductionposted by Mankisha Veng Veng on
Dear Concern:-
"..surface reflection and visibility of any surface 3 frit patterns.."
Pilot-Credits SSpc55:Bird collision deterrenceposted by Maciej Starewicz on
In General Pilot Documentation Requirements we can find the following position:
Regional priority credits that are already part of another category on the checklist
NC-v4 RPc1:Regional priorityposted by João Costa on
Hi all,
This is my first time in four years doing LEED related work, so I'm a little rusty.
MPR 2 - different existing building on a railway station area
NC-v4 MPR2:Must use reasonable LEED boundariesposted by veronica andreis on
hello, we are facing a renovation of some buildings in an existing railway station area
LEED v4.1 EB O&M: How can data center projects overcome the constraints of the Arc energy score?
EBOM-v4.1 EAp3:Energy Performanceposted by JL on
For LEED v4.1 EB O&M projects, I understand that Energy Performance scores are assigned in the Arc platform by considering a building's floor area, occupancy, and operating hours.
Existing Cooling Towers and Evaporative Condensers Prerequisite
NC-v4 WEp2:Indoor water use reductionposted by Green Projects on
For a new construction building tying into existing utility plant located outside of the LEED project boundry and scope of the new construction.