Smoking area on rooftop

NC-v4 EQp2:Environmental tobacco smoke control
posted by  Hunyum Murya  on 

If the project has a building that has a rooftop lounge, allowing smoking is that allowed within the credit limits?

0

Preferred Parking Reductions and Designations

CS-v4 LTc7:Reduced parking footprint
posted by  Conor Merrigan  on 

I have two questions for a project we're currently working on:

1
Thu Mar 17, 2022, 8:14 pm

Designing with Nature - Green walls indoor

Pilot-Credits EQpc123:Designing with Nature, Biophilic Design for the Indoor Environment
posted by  ANTONIO CERECEDA  on 

Currently we are working in a LEED project which we are pursuing this pilot credit of Designing with Nature, and we are wondering if green walls indoor could be one of the five strategies?

2
www.afogreenbuild.com
Green Building Consultant
LEEDuser Premium Member
249 thumbs up
Thu Mar 17, 2022, 4:46 pm

"..surface reflection and visibility of any surface 3 frit patterns.."

Pilot-Credits SSpc55:Bird collision deterrence
posted by  Maciej Starewicz  on 

In General Pilot Documentation Requirements we can find the following position:

2
Director of Sustainability
Walker Architects
LEEDuser Premium Member
3 thumbs up
Wed Mar 16, 2022, 3:58 pm

Regional priority credits that are already part of another category on the checklist

NC-v4 RPc1:Regional priority
posted by  João Costa  on 

Hi all,

This is my first time in four years doing LEED related work, so I'm a little rusty.

3
Tue Mar 15, 2022, 2:18 pm

MPR 2 - different existing building on a railway station area

NC-v4 MPR2:Must use reasonable LEED boundaries
posted by  veronica andreis  on 

hello, we are facing a renovation of some buildings in an existing railway station area

0

LEED v4.1 EB O&M: How can data center projects overcome the constraints of the Arc energy score?

EBOM-v4.1 EAp3:Energy Performance
posted by   JL  on 

For LEED v4.1 EB O&M projects, I understand that Energy Performance scores are assigned in the Arc platform by considering a building's floor area, occupancy, and operating hours.

0

Existing Cooling Towers and Evaporative Condensers Prerequisite

NC-v4 WEp2:Indoor water use reduction
posted by  Green Projects  on 

For a new construction building tying into existing utility plant located outside of the LEED project boundry and scope of the new construction.

1
Mon Mar 14, 2022, 6:52 pm