Phased Occupancy and IAQ Testing
CI-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Melissa Wrolstad on
I have a CI project with 4 floors and phased occupancy. Two floors will be occupied while two are still under construction.
Option 3, Approach 2 – selection of a random sample by elevators
EBOM-2009 SSc4:Alternative Commuting Transportationposted by Jessica Hawley on
We have a 6 story multi-tenant downtown office building located in close proximity to public transportation.
Data center --IT energy sub meter calibration
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Shoko Yasuda on
Hi, I am involved in EBOM case with a data center. As noted above, basically we do not need calibration since we use data from utility bill. Yet for a data center we have to measure UPS output ener
Wood nailer on mechanical curbs to be included in FSC calc?
NC-2009 MRc7:Certified Woodposted by David Hubka on
Is it required to submit the info on the wood nailers when pursuing the Certified Wood Credit?
No Manufacturer and No Model Name.
EBOM-2009 EAp3:Fundamental Refrigerant Managementposted by Simon Sue on
Our project is a multi tenant space and consist few restaurant. we unable to identify the manufacturer and model name of the refrigerator but we able to know the type of refrigerant used.
Documentation Requirements
CS-2009 MRc1:Building Reuse—Maintain Existing Walls, Floors and Roofposted by Robyn Williams Heeks on
In the LEED User documentation toolkit they describe using elevations to verify the exisiting / new calculations.
Machine Roomless Elevators
NC-2009 IDc1:Innovation in Designposted by Aliesa Adelman on
Has anyone gone after an ID point for using Machine Roomless Elevators?
the Floorscore certification process
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Steve Loppnow on
Greetings LEEDusers! Does anyone have experience with taking a product through the Floorscore certification process? What is required for the testing, CA 01350 compliance only?
Driver's Toilets in a Core & Shell Building
CS-2009 WEp1:Water Use Reductionposted by Maya Karkour on
Hi, We are working on a luxurious Core & Shell Residential Building. The future tenants will decide on the water fixtures for their own flats/apartments.
Minimum number required by local zoning regs
CI-2009 SSc3.3:Alternative Transportation—Parking Availabilityposted by Patricia Ewanski on
I'm not so savvy with how local zoning regs are worded. I did search for my city's local zoning regs and I'm not sure if what I found is it.