Forum quick links
Recommissioning vs Commissioning experience for CxA
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Dustin Campbell on
We would like to get a comment from someone that has had experience with this: When selecting a CxA, would someone that has eperience on 2 or more projects as the "Recommissiong Authority" be suff
double counting 7.1 and 7.2?
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by Christopher Sawyer on
My project is a bus maintaince depot in New York City with a zero lot line. The top floor (under the "roof" is all bus parking for vehicle maintenance and storage).
A person who is responsible for the thermal comfort?
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Mathilda Jonsson on
In the project I'm working at there are seperate office spaces.
Custom Built Salvaged Wood Furniture
CI-2009 MRc3.2:Materials Reuse—Furniture and Furnishingsposted by Max Calabro on
I'm working on a restaurant, and we're having our dining tables custom built from salvaged wood.
Louver Vents
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Biagio Arevalo on
Does anyone know if for the prescriptive path the light that passes through lovers count?
LT, VLT & Tvis
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Biagio Arevalo on
I´m planning to approach this credit through the prescriptive path but I´ve been having some difficulties finding the Tvis for the glass.
Occupant "Eco-involvement"
CS-2009 IDc1:Innovation in Designposted by Julien Daclin on
On a french project, the future occupants will be involved in the best practice functionning of the building. When external conditions are satisfying (temperature and wind) LCD screens placed in th
Limiting access once the building is enclosed
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Vanessa Seibert on
Our experience on projects is that limiting the access to one door with a long, regularly cleaned carpet, is expected by the LEED reviewer.
Exhausted heat
NC-2009 EAc1:Optimize Energy Performanceposted by Kath Williams on
Can a LEED project use exhausted/waste heat (and claim credit of some kind) from an adjacent building that is not being included in LEED project boundary?
Systems Furniture Panel Fabric
CI-2009 IEQc4.5:Low-Emitting Materials—Systems Furniture and Seatingposted by Lori Selcer on
We have specified panel sysems for our project which are Greenguard certified. However we are using COM fabric for the panels, that is, we are using fabric from another manufacturer.