Forum quick links
When to submit documentation
NC-2009 IDc2:LEED Accredited Professionalposted by javier bolanos zeledon on
I didn't know where to put this question. I would like to know when is the deadline for submitting documentation.
Number of facilities for transportation center
CS-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Robert Phinney on
We are renovating (to LEED CS V3) a train/bus station and cannot determine how to equate the number of bike racks for the project.
No Fixtures Installed in Core & Shell Scope
CS-2009 WEp1:Water Use Reductionposted by Lauren Ulmer on
From what I have read on this website, my understanding is that if we are not installing any plumbing fixtures as part of the Core & Shell work, then we must make the water reduction a requirem
Definition of Entrances
EBOM-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Emma Sanborn on
My question is whether an inoperative door qualifies as an entry, and thus needs a 7.5 m buffer area.
EAp2 CaGBC Calculator
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Emma Sanborn on
I am working on achieving LEED for a convention centre in Canada.
Tracking / documenting items being reused from demo'd bldg
NC-2009 MRc2:Construction Waste Managementposted by Renee Shirey on
On our site we have several items that will be salvaged from our demo'd building/site (furniture, playground equipment) that will be used with the new building/site.
Non-Energy Star Rated Products
EBOM-2009 MRc2:Sustainable Purchasing—Durable Goodsposted by Matthew Macko on
How do you count products that are not rated by ENERGY STAR, like microwave ovens? Can you exempt them entirely from the total cost of durable goods?
Construction Waste Theft!
NC-2009 MRc2:Construction Waste Managementposted by Jeffrey Westall on
We are having a serious issue with all of our metal scrap being stollen from the jobsite dumpster. This has impacted our percentage for recycling dramatically. We are currently at only 28%.
Trees
NC-2009 MRc2:Construction Waste Managementposted by Norma Lehman on
We are removing a lot of trees on our construction site, if we turn it into mulch does this qualify toward our CWM credit? or would it be material reuse? thanks for your help!
Restrooms removed from scope of work
CI-2009 WEp1:Water Use Reduction—20% Reductionposted by Laurie Hughet-Hiller on
I've read all the comments here, but I'm still at a loss. I have a 3-building campus project in which one building is LEED CI and the others are LEED NC.