CI-2009 MRc1.2:Building Reuse—Maintain Existing Interior Nonstructural Elementsposted by Sara Neff on
I looked through the reference guide for a definition of 'finished,' but I couldn't find one, so I'm hoping someone here can help: I have a CI project that is moving into a space that has existing
Private lavatory faucet
CI-2009 WEp1:Water Use Reduction—20% Reductionposted by Sundararaj Subburaman on
Hi, We have a project that consists of an office space, a laboratory, and a salon area for testing health care products.
Too much Window Area (WA)?
Schools-2009 IEQc8.1:Daylight and Views—Daylightposted by Rebecca Griffith on
Is it possible to have too much window area, therefore disqualifying a room from being included in the total daylit area?
LEED 2009 for New Construct, Optimize Energy Perform - EA CR 1
NC-2009 EAc1:Optimize Energy Performanceposted by John Harrington on
I have two buidings on the same site/project boundry. Do I model the two buildings as one building?
Energy coming from a off-site own renewable source
NC-2009 EAp2:Minimum Energy Performanceposted by Jose Salinas on
Our project involves a production plant for pasta and support facilities in Santiago, Chile.
Residential apartments Lighting Power Density
NC-2009 EAp2:Minimum Energy Performanceposted by Sustainability Provider on
Dear All, I'm working on a residential apartments project and I'm trying to figure out what ASHRAE 90.1-2007 mandates as maximum lighting power density for this kind of projects.
Construction Details in Baseline Model
NC-2009 EAp2:Minimum Energy Performanceposted by Xing Shi on
In ASHRAE90.1-2007, the construction type and U value of Baseline Model is regulated.
case 2. Residential and Hospital Projects Only - Requirements
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Veronika Sundberg on
Hi, I have a question regarding case 2. Residential and Hospital Projects Only. In the requirement for the prerequiset 8 bullets are listed that needs to be met.
Energy Bills are the Entire Site and Not Broken Down by Building
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Cynthia Fowler on
My project building is one of 40+ on a company's campus/site. They do not purchase electricity on a building-by-building basis, but for the entire site.
Looking for an example
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Eamon Geary on
In the course of the 30+ LEED projects I have participated in, I have never successfully achieved this credit.