Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Energy Modeling: Dome (Design) vs. Dome (Baseline)?

NC-2009 EAc1:Optimize Energy Performance
posted by  Nelina Loiselle  on 

I am working on the LEED Certification of a 23,000sq.ft. concrete "business continuity" dome. It is literally a concrete dome.

3
Thu Sep 8, 2011, 2:49 pm

green power for residential hi-rise

NC-2009 EAc6:Green power
posted by  Lorey Flick  on 

How can this credit be achieved if the building is a high-rise residential building where all apartments are separately metered? This is a rental building.

5
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Sep 7, 2011, 11:44 pm

Tenant spaces simulation without HVAC

CS-2009 EAc1:Optimize Energy Performance
posted by  victor mattos  on 

Does anyone knows if the tenant spaces shall be simulated with HVAC system for a shopping mall or can i just simulate with idealloads? I searched in the LEED Reference guide Appendix 2 but it does

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Sep 7, 2011, 7:06 pm

Seawater flushing

CI-2009 WEc1:Water Use Reduction
posted by  Edwin Wealend  on 

Hi Does anyone know if sea water flushing which is non-potable water can contribute towards these credits. We are working on new LEED-CI project in Hong Kong that uses sea water for flushing conne

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Wed Sep 7, 2011, 5:45 am

Warehouse Flush Out

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Curt Pascoe  on 

Both NCv2.2 and v2009 are clear with the temperate and humidity constraints.

2
P.E., LEED AP BD+C
Ryan Companies US, Inc.
LEEDuser Basic Member
87 thumbs up
Tue Sep 6, 2011, 12:27 pm

temporary use of hvac during construction

Schools-2009 IEQc3.1:Construction IAQ Management Plan—During Construction
posted by  Keelan Kaiser  on 

I have another question similar to above. We have a project that is substantially complete with construction, the cleaning crews are in right now. Only flooring remains to be installed.

2
Architect and Educator
Serena Sturm Architects and Judson University
LEEDuser Basic Member
93 thumbs up
Sun Sep 4, 2011, 2:54 am

Off Site renewable energy -- Is elegible?

NC-2009 EAc2:On-Site Renewable Energy
posted by  Jose Salinas  on 

Hi, I have the following question: a company that is pursuing LEED certification. Owns a low impact renewable energy plant, but this plan, that is a pass hidraulic plant on a river, is off-site.

2
CEO
Green Commons, LLC
LEEDuser Expert
586 thumbs up
Sun Sep 4, 2011, 2:38 am

Leed CS for Bus Station.

CS-2009 EAc1:Optimize Energy Performance
posted by  Donovan Aguirre  on 

The project I am working on is a bus station that has an enclosed retail area with an underground parking and an outdoor above ground parking space.

5
Fri Sep 2, 2011, 9:09 pm

Warm mix asphalt

NC-2009 IDc1:Innovation in Design
posted by  Aliesa Adelman  on 

Has anyone had luck going after an ID credit for using warm mix asphalt?

3
Default Avatar
Sustainability Program Manager
Wendel
LEEDuser Basic Member
33 thumbs up
Fri Sep 2, 2011, 4:52 pm

Policy, "Measurement and Records"

EBOM-2009 MRp1:Sustainable Purchasing Policy
posted by  Dennis Palmer  on 

The example provided for each policy specifically states measured values, for example Durable Goods Procurement measured value is within a given year at least 40% of the purchase shall be energy st

2
Thu Sep 1, 2011, 7:56 pm