Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Creme Marfil Marble

CI-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Colleen Ice  on 

I see a lot of threads based on hard surface materials being exempt, but what about marble.

2
Tue Sep 27, 2011, 6:13 pm

Expected volume of recycling

CI-2009 MRp1:Storage and Collection of Recyclables
posted by  Nina Tallering  on 

How do I calculate the 'expected volume of recycling'? I realize this is a redundant post/question, however, we continue to receive GBCI preliminary review comments that request the expected volum

2
Sustainable Project Manager
KEMA Services
LEEDuser Basic Member
28 thumbs up
Tue Sep 27, 2011, 5:23 pm

landfill has a recycle/reuses program in place

NC-2009 MRc2:Construction Waste Management
posted by  ming zeng  on 

We have a project that the local landfill has a recycle/reuse program. For example, they will chip out wood and reuse it as road bed materials to build the road system in the landfile.

3
Tue Sep 27, 2011, 2:47 pm

Modeling a unique HVAC System

NC-2009 EAp2:Minimum Energy Performance
posted by  matthew strong  on 

We have a campus project that has a unique HVAC system for cooling that reuses return water from a central plant that has already circulated to other campus buildings.

2
Tue Sep 27, 2011, 12:13 pm

NEBB Certification Required?

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Nathan Lee  on 

A question about NEBB Certification. Is the CxA required to have an NEBB certification in order to qualify?

2
Default Avatar
Project Engineer
SGS Korea
LEEDuser Basic Member
36 thumbs up
Tue Sep 27, 2011, 1:58 am

Control types in Group Multi-occupant Spaces

EBOM-2009 IEQc2.2:Controllability of Systems—Lighting
posted by  Jenny Carney  on 

All, Word on the street is that there's a new standard teams are being held to for the types of controls that are allowed in group spaces.

3
Principal
Ackerstein Sustainability, LLC
LEEDuser Expert
545 thumbs up
Mon Sep 26, 2011, 7:52 pm

Existing Finish

CI-2009 MRc1.2:Building Reuse—Maintain Existing Interior Nonstructural Elements
posted by  Sara Neff  on 

I looked through the reference guide for a definition of 'finished,' but I couldn't find one, so I'm hoping someone here can help: I have a CI project that is moving into a space that has existing

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Sun Sep 25, 2011, 10:05 am

Private lavatory faucet

CI-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Sundararaj Subburaman  on 

Hi, We have a project that consists of an office space, a laboratory, and a salon area for testing health care products.

2
Integrated Design & LEED Specialist
SERA Architects
LEEDuser Expert
1361 thumbs up
Fri Sep 23, 2011, 5:05 am

Too much Window Area (WA)?

Schools-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Rebecca Griffith  on 

Is it possible to have too much window area, therefore disqualifying a room from being included in the total daylit area?

12
b.i.g. Bechtold DesignBuilder Expert
LEEDuser Basic Member
581 thumbs up
Wed Sep 21, 2011, 12:51 pm

LEED 2009 for New Construct, Optimize Energy Perform - EA CR 1

NC-2009 EAc1:Optimize Energy Performance
posted by  John Harrington  on 

I have two buidings on the same site/project boundry. Do I model the two buildings as one building?

2
Mon Sep 19, 2011, 8:40 pm