CI-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Colleen Ice on
I see a lot of threads based on hard surface materials being exempt, but what about marble.
Expected volume of recycling
CI-2009 MRp1:Storage and Collection of Recyclablesposted by Nina Tallering on
How do I calculate the 'expected volume of recycling'? I realize this is a redundant post/question, however, we continue to receive GBCI preliminary review comments that request the expected volum
landfill has a recycle/reuses program in place
NC-2009 MRc2:Construction Waste Managementposted by ming zeng on
We have a project that the local landfill has a recycle/reuse program. For example, they will chip out wood and reuse it as road bed materials to build the road system in the landfile.
Modeling a unique HVAC System
NC-2009 EAp2:Minimum Energy Performanceposted by matthew strong on
We have a campus project that has a unique HVAC system for cooling that reuses return water from a central plant that has already circulated to other campus buildings.
NEBB Certification Required?
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Nathan Lee on
A question about NEBB Certification. Is the CxA required to have an NEBB certification in order to qualify?
Control types in Group Multi-occupant Spaces
EBOM-2009 IEQc2.2:Controllability of Systems—Lightingposted by Jenny Carney on
All, Word on the street is that there's a new standard teams are being held to for the types of controls that are allowed in group spaces.
Existing Finish
CI-2009 MRc1.2:Building Reuse—Maintain Existing Interior Nonstructural Elementsposted by Sara Neff on
I looked through the reference guide for a definition of 'finished,' but I couldn't find one, so I'm hoping someone here can help: I have a CI project that is moving into a space that has existing
Private lavatory faucet
CI-2009 WEp1:Water Use Reduction—20% Reductionposted by Sundararaj Subburaman on
Hi, We have a project that consists of an office space, a laboratory, and a salon area for testing health care products.
Too much Window Area (WA)?
Schools-2009 IEQc8.1:Daylight and Views—Daylightposted by Rebecca Griffith on
Is it possible to have too much window area, therefore disqualifying a room from being included in the total daylit area?
LEED 2009 for New Construct, Optimize Energy Perform - EA CR 1
NC-2009 EAc1:Optimize Energy Performanceposted by John Harrington on
I have two buidings on the same site/project boundry. Do I model the two buildings as one building?