Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

GLP certification required or could you just meet the testing..?

CI-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Raymond Loo  on 

Working on a project in Hong Kong where the client is considering the purchase of some carpets that are manufactured in Japan.

8
Senior Manager, Corporate Services
MEA & Associates Limited (Hong Kong)
LEEDuser Basic Member
62 thumbs up
Fri Oct 7, 2011, 4:24 pm

Thermal Comfort in Public Spaces

CI-2009 IEQc6.2:Controllability of Systems—Thermal Comfort
posted by  Rick Servoss  on 

How would one address this credit when the CI project is made up entirely of public space?

2
Thu Oct 6, 2011, 3:19 pm

LEED Offline Calculator Space Type Definitions/EUI's

EBOM-2009 EAc1:Optimize Energy Performance
posted by  Joshua Peterson  on 

Is there a resource that further defines the activity space types as listed on the Case 2 LEED Offline Calculator and thier respective Source EUI's?

2
Default Avatar
ecoPreserve: Building Sustainability
LEEDuser Basic Member
101 thumbs up
Thu Oct 6, 2011, 1:34 am

Tracking energy consumption through the performance period

EBOM-2009 EAc1:Optimize Energy Performance
posted by  gwenedd murray  on 

I understand the 12 mos tracking time period can start before the performance period begins but it must also include the performance period.

2
Project Consultant
Sustainable Design Consulting
LEEDuser Basic Member
25 thumbs up
Wed Oct 5, 2011, 5:24 pm

Case 1 vs. Case 2 and dimming versus A/V

Schools-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  David Mirabile  on 

OK, I am still a little confused based on some of the comments below, but to me it is 100% clear just by the template alone that it is an either/or and not both.

2
Wed Oct 5, 2011, 3:32 pm

Expiring Energy Star Rating and Eligibility for LEED

EBOM-2009 EAp2:Minimum Energy Efficiency Performance
posted by  Nelina Loiselle  on 

I have a large high rise with a data center in it. It's last Energy Star rating was September 2010.

3
Wed Oct 5, 2011, 3:26 pm

Zones, bay floor area

Schools-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Felix Hunziker  on 

Trying to use Option 2 and I'm confused about Zone Floor Area in the spreadsheet. Isn't the ZFA for sidelighting the same as the bay floor area?

3
Tue Oct 4, 2011, 6:01 pm

flag lights

Pilot-Credits SSpc7:Light pollution reduction
posted by  Bill Swanson  on 

I was just thinking. If this Credit allows us to exclude adversiment lighting and theme park lighting why is it so difficult to exclude flag lighting.

9
Tue Oct 4, 2011, 1:06 pm

heating load unmet hours

NC-2009 EAc1:Optimize Energy Performance
posted by  Razan Nejem  on 

in the energy modeling result using HAP, the heating load unmet hours turns out to be 2000, however it shouldn't exceed 300 hours, knowing that our system is chilled water not dx units and the Tsta

3
Default Avatar
Environmental Engineer, LEED AP BD+C
LEEDuser Basic Member
38 thumbs up
Tue Oct 4, 2011, 12:05 pm

Drawing the 1/2 Mile Radius for Community Connectivity Credit

NC-2009 SSc2:Development Density and Community Connectivity
posted by  Joshua Bloom  on 

I am trying to plot out the 10 community connectivity locations using either google maps or bing maps, and I am unable to draw a 1/2 mile radius circle to enclose the area.

3
Mon Oct 3, 2011, 11:33 pm