Forum quick links
Install submeters for a factory with 90% of Process load
NC-v4 EAc3:Advanced energy meteringposted by Michael on
My project is a factory with more than 90% of energy consumption coming from Process load (for production purposes).
Weighted average SRI values for option 2 parking under cover
NC-v4 SSc5:Heat island reductionposted by Julio Fernandez Amodia on
Hi,
CDPH VOC Emissions Certificate Expired
NC-v4 EQc2:Low emitting materialsposted by Peter Doo on
I have a submittal that includes a resinous flooring product for which the CDPH 01350 v1.2-2017 VOC emissions testing certificate expired in September of 2019.
Air Curtains vs. Vestibules
CS-2009 EAp2:Minimum Energy Performanceposted by Ralf Lehmann on
It seams to be a topic that is interesting for several members of LEED user. Since March the new International Green Construcion Code (IgCC) is available.
Commitment to Share Data - Military Facility
NC-v4 EAp3:Building-level energy meteringposted by Dane Andersen on
Has anyone worked on LEED certification for a military facility?
Recertification
EBOM-2009 MPR6:Must commit to sharing whole-building energy and water usage dataposted by Kevin Mowatt on
If a building was certified in January 2019 under v3, when is recertification required?
How to identify regularly occupied spaces in a mall building?
CS-v4.1 EQc4:Daylightposted by Julio Fernandez Amodia on
Hi,
I am pursuing this credit for a mall building, and I wonder what the right way to identify the regularly occupied spaces is.
Letter
CI-v4.1 IPc1:Integrative Processposted by Aleksandra Suchomska on
Hi,
my team is doing the integrative process letter for the first time. How long should it be? How detailed should be the description of each analyzed area?
Dishwasher requirements
CI-v4.1 WEp1:Indoor Water Use Reductionposted by Aleksandra Suchomska on
Hi,
eQUEST DOE2.3 for LEED V4 EAp2 and EAc1
NC-v4 EAp2:Minimum energy performanceposted by Vipul Babriya on
Hello Everyone,