CS-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Caroline Ma on
Any difference between Secure bicycle racks and secure bicycle storage? In CS project with area larger that 300,000 sq.ft. (CS case 2), we need to provide secure bicycle storage.
No Engineer on Project
CI-2009 IEQp1:Minimum IAQ Performanceposted by Paul Meyer, PE, CEM, CBCP, GBE LEED AP on
All HVAC mechanical systems were existing. Only the ductwork was installed. There is Engineer for this project is there a way to comply without the signature?
Steel Joists & Deck
NC-2009 MRc5:Regional Materialsposted by Jeremy Hatfield on
I am a bit confused when it comes to Steel Joist and Deck. New Millennium and Vulcraft obtain steel from mills.
Stated Cost
NC-2009 MRc5:Regional Materialsposted by matthew convery on
When calculating both the regional material and recycled content material percentages, do you use the subcontractors cost or can they include their markup?
Using ASHRAE Addenda
CI-2009 EAp2:Minimum Energy Performanceposted by Luis Miguel Diazgranados on
Hi everybody; The reference guide states "Project teams wishing to use ASHRAE approved addenda for the purposes of this credit may do so at their discretion.
Template issues for Option 1
Schools-2009 IEQp3:Minimum Acoustical Performanceposted by renee jimenez on
Per the LEED reference guide it states that for Option 1 we are to “Confirm that 100% of all ceiling areas (excluding lights, diffusers and grilles) in all classrooms and core learning spaces are f
Alternative Commuting
EBOM-2009 SSc4:Alternative Commuting Transportationposted by Aron Weis on
Does the fact that 80% of the people in the building I am evaluating for LEED-EB have FlexFuel cars help? Even if they do not use FlexFuel (Ethanol 85)?
Sample of Measurement and Verification report for Option B?
NC-2009 EAc5:Measurement and Verificationposted by Eric JS on
Dear all, Do you have any sample of Measurement and Verifiation report for Option B? Thank you and cheers!
Core Performance Guide Requirements for Efficiency
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Erik Dyrr on
To earn 5 points using Option 1: Equipment Efficiency, systems must comply with the efficiency requirements outlined in the Core Performance Guide.
Energy simulation
CI-2009 EAp2:Minimum Energy Performanceposted by Pongthon Junnapat on
For LEED ID+C project, Do we have to include the entire building for energy simulation modeling? or just tenant scope of work Thanks in advance